# AI Infrastructure Boom to Lift Korean Chip Sales to Record Highs by 2028

> AI buildouts are set to push South Korean chip sales to records by 2028 as data centers scale. HBM and foundry demand surges, with multi-year deals and larger contract values ahead.

- Type: AI news
- Page: https://completeaitraining.com/news/ai-infrastructure-boom-to-lift-korean-chip-sales-to-record/
- Published: 2025-10-15
- Updated: 2025-10-15
- Author: Jeroen Erne
- Jobs: Sales
- Reading time: 2 min

### AI Infrastructure Surge Poised to Drive Korean Chip Sales to Record Levels by 2028

Global demand for AI chips is set to hit a short-term peak in 2028. That wave is expected to push sales of South Korean semiconductors to nearly double from current levels as data centers scale up.

The driver is clear: AI servers and infrastructure. One estimate points to around US$1 trillion earmarked for data center build-outs by a leading AI chip vendor, pushing memory and foundry orders higher across the supply chain.

#### Key numbers sales teams should track

- HBM (high bandwidth memory) market: projected at $41.6 billion this year, up 125.5% year-over-year.
- Potential scenario: if HBM capacity rises 2.5x from current levels, sales of South Korean semiconductors could nearly double within three years.
- Memory chips market: projected to reach an all-time high of $201 billion.
- Foundry market: projected at $170.8 billion, up 22.1% year-over-year.
- Outlook: strong performance expected through 2028, despite concerns around the fast rise in chip stocks.

#### Why this matters for sales

Budgets are flowing into AI infrastructure-servers, HBM, GPUs, networking, storage, and system integration. That means multi-threaded buying cycles, large multi-year deals, and cross-functional stakeholders (IT, finance, product, compliance).

If you sell hardware, cloud, software, or services tied to AI workloads, this cycle creates bigger deal sizes, more expansion paths, and longer contracts.

#### What to prioritize in your pipeline

- AI server deals: bundle compute + HBM + networking + support to increase average contract value.
- Data center upgrades: pitch power, cooling, and interconnect improvements as a prerequisite for AI rollouts.
- Storage tiers for training/inference: position fast tiers for hot data and economical tiers for archives.
- Foundry-aligned timelines: sync proposals with chip and HBM availability to avoid fulfillment gaps.
- Co-selling with ecosystem partners: ISVs, SI/consulting, and cloud providers to reduce friction and speed deployment.

#### Timing and territory strategy through 2028

With demand peaking by 2028, plan multi-year sequences now. Aim to lock in framework agreements and options that scale capacity as HBM supply expands.

- Front-load account mapping for data center operators, hyperscalers, telcos, and AI-heavy enterprises.
- Use capacity outlooks to anchor delivery schedules and prevent missed quarters due to constraints.
- Package financing and consumption-based models to win competitive bake-offs.
- Align proofs-of-concept with customer model roadmaps to speed conversion.

#### Risks to watch (and how to sell around them)

- Stock volatility: customers may hesitate on timing-offer phased rollouts and price protections.
- Supply constraints: secure allocations early; propose alternative configurations to keep projects on track.
- Policy and export controls: keep compliance front-and-center; offer clear documentation and region-specific SKUs.
- Workload shifts: design modular solutions that adapt across training and inference without major rework.

#### Next steps

- Stay close to data center roadmaps from leading AI chip vendors. Reference materials: [NVIDIA Data Center Overview](https://www.nvidia.com/en-us/data-center/?ref=completeaitraining.com).
- Upskill your team on AI buyer conversations and use cases by role: [AI courses by job](https://completeaitraining.com/courses-by-job/).

Bottom line: AI infrastructure spend is accelerating through 2028. Position your offers around HBM-driven upgrades, data center capacity, and multi-year flexibility to capture the upswing.

---

This is the Markdown form of https://completeaitraining.com/news/ai-infrastructure-boom-to-lift-korean-chip-sales-to-record/. The whole site is mapped at https://completeaitraining.com/llms.txt.
