# SuperX FY2025 Results Mark Pivot to AI Infrastructure; FY2026 Focus: NVIDIA Ecosystem, 800VDC, Liquid Cooling, and AI Factory Rollout

> SuperX's FY2025 was a reset-legacy-heavy results, initial AI server sales, and a loss while ramping up. FY2026 brings capital-backed JVs, 800VDC, liquid cooling, and faster builds.

- Type: AI news
- Page: https://completeaitraining.com/news/superx-fy2025-results-mark-pivot-to-ai-infrastructure/
- Published: 2025-11-02
- Updated: 2025-11-02
- Author: Jeroen Erne
- Jobs: Operations
- Reading time: 3 min

### SuperX FY2025 Results: Operations Briefing and What's Coming in FY2026

SuperX AI Technology Limited (NASDAQ: SUPX) closed FY2025 as a transition year-moving from interior design to full-stack AI infrastructure. The reported numbers reflect legacy work with a late-quarter bump from initial AI equipment sales. Heading into FY2026, the company has capital, new joint ventures, and an execution plan centered on AI data center buildouts.

#### FY2025 at a glance (legacy-heavy results)

- Revenue: $3.6 million, including roughly $1 million from AI servers and related IT equipment in June 2025.
- Net loss: $21.2 million, driven mainly by non-cash items and higher staffing and professional costs tied to AI R&D ramp-up.
- Liquidity and assets: $17.2 million in cash and cash equivalents; $52.1 million in total assets at year-end.
- Note: FY2025 results primarily reflect legacy services, with partial AI contributions after the rebrand to SuperX.

For detailed disclosures and risk factors, review the company's latest Annual Report on Form 20-F filed with the SEC. [EDGAR search](https://www.sec.gov/edgar/search/?ref=completeaitraining.com#/entityName=SuperX%20AI%20Technology)

#### What changed after year-end (July-October 2025)

- Electrical systems: "SuperX Digital Power" JV with Zhonhen Electric focused on HVDC for AI data centers; launched the Panam-800VDC end-to-end solution (new builds) and Aurora-800VDC retrofit solution (existing sites).
- Thermal management: "SuperX Cooltech" JV with Chengtian Weiye covering CDUs, Micro-Channel Liquid Cold Plates, and integrated cooling systems.
- GPU supply and design access: Majority stake in MicroInference, a Singapore-based NVIDIA Partner Network Solution Provider, to strengthen supply and solution design. Learn more about the program context here: [NVIDIA Partner Network](https://www.nvidia.com/en-us/partners/?ref=completeaitraining.com).
- Global services: "SuperX Global Service" JV with Teamsun to deliver deployment, maintenance, and managed services at scale.
- Footprint: Japan AI Supply Center planned to be operational by end of 2025; U.S. subsidiary in Silicon Valley targeted to be operational by end of 2025 for R&D and market delivery.
- Product releases: Next-gen AI servers (XN9160-B200, XN9160-B300) and an All-in-One Multi-Model Server series. New rack-scale AI platform based on NVIDIA GB300 chips. A Modular AI Factory solution aiming to compress data center deployment cycles to under six months.

#### What this means for Operations

If you manage data center capacity, procurement, or deployment, the signal is clear: SuperX is organizing a full lifecycle offering-from electrical and cooling to servers, integration, and services. Below are the operational angles to evaluate now.

- Electrical architecture: 800VDC implies a different distribution strategy, safety protocols, and testing procedures. The "retrofit" option suggests brownfield paths without a full rebuild, but still demands facility audits and staff training.
- Cooling shifts: Liquid solutions (CDUs, cold plates) change floor layouts, serviceability, water treatment, and monitoring. Plan for leak detection, maintenance windows, and spare part stocking.
- GPU allocation and lead times: NPN access may help with supply, yet you should still lock procurement windows and stage deliveries to match installation crews and commissioning schedules.
- Faster deployment promises: A data center-scale modular approach can shorten delivery, but only if permitting, site readiness, utility interconnects, and compliance documentation are in sync. Build a cross-functional timeline up front.
- Global services and SLAs: With a services JV, ask for standard operating procedures, escalation paths, and on-site response times by region. Validate RMA logistics and spares pools before go-live.
- Vendor stability and financing: The company reports more than $70 million raised since March 2025 and agreements for over $170 million more in October 2025. Confirm support commitments and financing options for multi-quarter rollouts.

#### FY2026 roadmap: checkpoints for customers

- Integration of acquisitions and JVs: Request a unified product catalog, compatibility matrix, and reference architectures that cover electrical, cooling, servers, and services.
- AI factory deployments in key markets: Ask for pilot outcomes, performance data, and total cost envelopes for greenfield and retrofit projects.
- Partner ecosystem: Clarify relationships with silicon vendors, OEMs, and financial institutions; explore leasing or consumption models if capex is constrained.
- Service coverage: Verify on-the-ground teams, language support, and change-management alignment in your regions.

#### Quick action list for Ops leaders

- Run site surveys for 800VDC readiness and liquid cooling feasibility (including safety, compliance, and training needs).
- Model thermal and electrical loads for rack-scale deployments and define commissioning/acceptance test plans.
- Engage procurement now to secure GPU allocations and coordinate logistics with installation milestones.
- Finalize SLAs: response times, escalation policies, spares, and RMA processes; document roles and handoffs.
- Upskill your team on AI data center operations and tooling. If you need structured learning paths, see job-focused options here: [Complete AI Training - Courses by Job](https://completeaitraining.com/courses-by-job/).

#### Key dates to watch

- Japan AI Supply Center: expected operational by end of 2025.
- U.S. subsidiary (Silicon Valley): expected operational by end of 2025.

Note: This update includes forward-looking statements from the company. For risks and assumptions, see its latest Form 20-F on the SEC's website. [EDGAR search](https://www.sec.gov/edgar/search/?ref=completeaitraining.com#/entityName=SuperX%20AI%20Technology)

#### About SuperX

SuperX AI Technology Limited provides AI infrastructure solutions spanning hardware, software, and services for AI data centers. Offerings include high-performance AI servers, 800VDC solutions, high-density liquid cooling, AI cloud, and AI agents. The company is headquartered in Singapore and serves global institutional clients. More at [superx.sg](https://www.superx.sg/?ref=completeaitraining.com).

---

This is the Markdown form of https://completeaitraining.com/news/superx-fy2025-results-mark-pivot-to-ai-infrastructure/. The whole site is mapped at https://completeaitraining.com/llms.txt.
