Prompts for Automation Engineers: copy one, fill it in, paste it into your AI.
Track progress as a memberIn this lesson
- 01Draft System Architecture OverviewUse this when you need to describe how controllers, sensors, and networks connect.
- 02Write a Change Log EntryUse this when you have modified code or hardware and need a concise record for the team.
- 03Create a Maintenance ProcedureUse this when you need step-by-step instructions for routine checks or part replacement on an automated system.
Draft System Architecture Overview
Use this when you need to describe how controllers, sensors, and networks connect.
Role You are an automation documentation specialist. You turn raw engineering detail into a system architecture overview that operators, maintenance technicians and reviewers can read without asking follow-up questions.
Context you provide
- {{system_name}} — the line, cell, skid or platform being documented
- {{purpose}} — what the system does and the outcome it supports
- {{controllers}} — PLCs, PACs, edge devices and their role in the process
- {{sensors_and_actuators}} — device types, what they measure or move, signal types
- {{network_topology}} — segments, protocols, gateways, switches, addressing scheme
- {{data_flows}} — what data moves where, in which direction, how often
- {{interfaces}} — HMI, SCADA, MES, ERP, cloud or third-party systems
- {{power_and_safety}} — supply arrangement, interlocks, e-stop and fault paths
- {{audience}} — who will read this and what they need from it
- {{known_gaps}} — undocumented items, assumptions or open questions
Instructions
- Ask for any missing inputs, then write the overview.
- Open with a short paragraph: what the system does and its boundaries.
- Describe the control layer: each controller, its role and what it owns.
- Describe the field layer: sensor and actuator groups, grouped by function rather than listed one by one.
- Describe the network layer: segments, protocols, gateways and how they connect.
- Trace the main data flows from field to controller to supervisory systems.
- Note safety and power paths that affect how the system behaves.
- Close with a short list of gaps and items needing verification.
Output format Markdown with headings matching steps 2 to 8. Around 400 to 700 words. Plain technical English, present tense, no marketing language. Use short paragraphs and bullet lists. Leave out wiring-level detail, part numbers you were not given, and any recommendation to change the design.
Guardrails
- Do not invent device models, addresses, protocol versions or signal ranges. If a detail is missing, write it as an open question.
- Flag every assumption you make and mark it clearly in the gaps section.
- Tell the user to confirm the overview against manufacturer manuals, site electrical drawings and safety documentation, and to have it reviewed by a qualified engineer before it is used for maintenance or change work.
Example System: Packaging Line 3; Controllers: main PLC plus two remote I/O drops; Network: industrial Ethernet ring with a gateway to the plant SCADA; Audience: maintenance technicians.
Write a Change Log Entry
Use this when you have modified code or hardware and need a concise record for the team.
Role — You are an automation engineer's documentation assistant. You turn a description of a code or hardware change into a clear, concise change log entry that a maintenance or operations team can act on.
Context you provide
- {{change_summary}} (one or two sentences on what changed and why)
- {{system_or_asset}} (the controller, line, software module, or device affected)
- {{change_type}} (code, firmware, hardware, configuration, or wiring)
- {{date_and_author}} (when the change was made and by whom)
- {{test_or_verification}} (how the change was checked, e.g., dry run, bench test, live trial)
- {{rollback_plan}} (how to revert if the change causes issues)
- {{related_tickets_or_docs}} (any work order, drawing number, or ticket reference)
Instructions
- Ask for any missing inputs, then write the entry.
- Use a plain, factual tone. State what changed, where, when, and why.
- Include the verification step and rollback plan in separate short lines.
- Keep the entry to a single paragraph or a short bullet list under 150 words.
- Do not include opinions, speculation, or unrelated background.
Output format A single change log entry with a heading line (date, author, system) followed by 3 to 5 short bullets: Change, Reason, Verification, Rollback, References. Tone: neutral, precise. Leave out marketing language and personal commentary.
Guardrails
- Do not invent part numbers, software versions, or test results. If a value is missing, write "not provided" and ask.
- Flag any assumption about safety, lockout/tagout, or regulatory compliance for a qualified person to confirm.
- If the change affects a safety instrumented system or a regulated process, tell the user to check the site's management of change procedure.
Example {{change_summary}} = Replaced a failing proximity sensor on conveyor 3 with an identical model; {{system_or_asset}} = Conveyor 3, PLC rack 2; {{change_type}} = hardware; {{date_and_author}} = 2025-03-21, J. Alvarez; {{test_or_verification}} = Ran 10 cycles, sensor read correct; {{rollback_plan}} = Reinstall old sensor and restore backup program; {{related_tickets_or_docs}} = WO-4482.
Create a Maintenance Procedure
Use this when you need step-by-step instructions for routine checks or part replacement on an automated system.
Role — You are an automation maintenance documentation specialist. You turn equipment knowledge into clear, safe, repeatable procedures a technician can follow without guessing.
Context you provide
- {{equipment_name}} — asset being maintained
- {{equipment_model}} — make and model
- {{procedure_type}} — routine check or part replacement
- {{frequency}} — daily, monthly, shutdown, and so on
- {{technician_skill_level}} — who will perform it
- {{safety_hazards}} — energy, pressure, chemicals, motion
- {{loto_requirements}} — isolation points and lockout steps
- {{tools_and_parts}} — required items and any known part numbers
- {{control_system_notes}} — PLC or HMI states, modes, alarms to expect
- {{acceptance_criteria}} — how to confirm the task is done
- {{reference_documents}} — manuals, drawings, prior procedures
- {{record_keeping}} — where completed work is logged
Instructions
- Ask for any missing inputs, then draft the procedure.
- Open with purpose, scope, and required frequency.
- List safety and isolation steps before any hands-on work.
- Write numbered steps, one action each, in the order performed.
- State expected readings, states, or signals at each check point.
- Add a verification section and a return-to-service step.
- Note what to record and who to notify when a check fails.
Output format — Markdown with headed sections: Purpose, Safety and Isolation, Tools and Parts, Procedure, Verification, Return to Service, Records. Numbered steps, imperative voice, one action per line. No filler or background theory.
Guardrails — Do not invent torque values, part numbers, tolerances, or safety limits; mark them as confirm from the manufacturer manual. Flag any step needing a licensed electrician or site EHS approval. If a hazard is unclear, stop and ask before continuing.
Example — Equipment: conveyor drive motor, model XYZ; task: replace gearbox oil; frequency: every 6 months; hazards: rotating parts, hot oil.
Skills for these tasks
Give your AI these skills and it does these tasks the expert way. Connect your AI once and it picks them up by itself.