Subcontractor Evaluation and Selection

17 prompts for Construction Contractors

Prompts for Construction Contractors: copy one, fill it in, paste it into your AI.

Track progress as a member

In this lesson

  1. 01Assess Subcontractor Cultural FitUse this when you need to evaluate how well potential subcontractors align with your company's values and work culture.
  2. 02Compare Subcontractor BidsUse this when you need to analyze and compare subcontractor bids for a construction project based on predefined criteria.
  3. 03Environmental Responsibility ReviewUse this when you need to evaluate subcontractors' environmental practices and sustainability for construction projects.
  4. 04Evaluate Subcontractor CapacityUse this when you need to assess a subcontractor's capacity and resources to ensure they can handle a construction project.
  5. 05Financial Stability AssessmentUse this when you need to evaluate subcontractors' financial health and stability for construction projects.
  6. 06Insurance and Bonding VerificationUse this when you need to verify subcontractors' insurance coverage and bonding capacity for construction projects.
  7. 07Interview Preparation for SubcontractorsUse this when you need to prepare for interviews with potential subcontractors, including question generation and response analysis.
  8. 08Legal Compliance VerificationUse this when you need to research and verify subcontractors' legal compliance for construction projects.
  9. 09Make Informed Subcontractor DecisionsUse this when you need to analyze and compare evaluation data to make a final, informed decision on subcontractor selection.
  10. 10Safety Record Review ChecklistUse this when you need to systematically evaluate subcontractors' safety records and practices.
  11. 11Subcontractor Performance Scorecard BuilderUse this when you need to create a structured scorecard to evaluate subcontractors based on their past project performance.
  12. 12Subcontractor Prequalification FrameworkUse this when you need to create a comprehensive assessment framework to prequalify subcontractors based on their qualifications, experience, and financial stability.
  13. 13Subcontractor Prequalification QuestionnaireUse this when you need to create a detailed questionnaire to gather information about subcontractors' qualifications, experience, and capabilities.
  14. 14Subcontractor Quality Evaluation CriteriaUse this when you need to develop criteria and benchmarks for evaluating the quality of work delivered by subcontractors.
  15. 15Subcontractor Reference Check QuestionsUse this when you need to prepare reference check questions for subcontractors or suppliers and analyze the responses.
  16. 16Subcontractor Risk AssessmentUse this when you need to evaluate and mitigate risks associated with selecting subcontractors for construction projects.
  17. 17Technology and Innovation AssessmentUse this when you need to evaluate subcontractors' use of technology and innovative practices.
1Copy the promptClick Copy on the prompt you need.
2Paste it into your AIChatGPT, Claude, Gemini or Copilot.
3Fill in the {{brackets}}Your own details, or let the AI ask you.
4Follow up and checkUse the follow-ups, then check the facts.
01

Assess Subcontractor Cultural Fit

Use this when you need to evaluate how well potential subcontractors align with your company's values and work culture.

Prompt

Role You are an organizational culture and partnership specialist. Your goal is to help assess the cultural fit of subcontractors to ensure smooth collaboration and alignment with company values.

Context you provide

  • {{company_values}}: The core values and work practices of your company.
  • {{subcontractor_info}}: Information about the subcontractor's culture, values, and work practices.
  • {{evaluation_criteria}}: Specific cultural aspects to prioritize, such as communication style, safety culture, or innovation.

Instructions

  1. If any required context is missing, ask for it before proceeding.
  2. Compare the subcontractor's cultural attributes with your company's values.
  3. Identify areas of alignment and potential conflict.
  4. Provide a scoring system to rank cultural fit based on the evaluation criteria.
  5. Highlight risks and opportunities for collaboration.

Output format Provide a structured report with sections: Summary, Alignment Analysis, Scoring, Risks, and Opportunities. Use a table for scoring and a professional tone.

Guardrails

  • Do not make assumptions about the subcontractor's culture without evidence.
  • Flag any subjective judgments and suggest how to verify.
  • Stay within the scope of cultural fit; do not provide legal or financial advice.

Example Company values: Safety first, innovation, transparency; Subcontractor info: Known for safety awards, but has a hierarchical decision-making style.

3 follow-up prompts
  • What specific cultural values should be prioritized during evaluations?
  • How can I address potential cultural conflicts with subcontractors?
  • What strategies can I employ to foster a positive subcontractor relationship?

Open as its own page

02

Compare Subcontractor Bids

Use this when you need to analyze and compare subcontractor bids for a construction project based on predefined criteria.

Prompt

Role You are a procurement and construction bidding expert. Your goal is to help compare subcontractor bids objectively and thoroughly, ensuring the best value and compliance.

Context you provide

  • {{project_type}}: The type of construction project (e.g., commercial building, renovation).
  • {{bid_criteria}}: The specific criteria to evaluate, such as cost, timeline, material quality, safety record, and compliance.
  • {{bid_data}}: The actual bid details from each subcontractor, including pricing, timelines, and any other relevant information.

Instructions

  1. If any required context is missing, ask for it before proceeding.
  2. Organize the bid data into a comparative framework based on the provided criteria.
  3. Evaluate each bid against the criteria, highlighting strengths and weaknesses.
  4. Provide a clear recommendation on which bid offers the best overall value, considering all factors.
  5. Suggest additional criteria that could enhance the evaluation process if relevant.

Output format Provide a structured comparison table followed by a detailed analysis. Include a summary of key findings and a final recommendation with rationale. Keep the tone professional and objective.

Guardrails

  • Do not invent bid data; use only the information provided.
  • Flag any assumptions made about the bids or criteria.
  • Stay within the scope of bid analysis; do not provide legal or financial advice.

Example Project type: Commercial building, Bid criteria: cost, timeline, material quality, safety record, Bid data: Subcontractor A: $1.2M, 6 months, high-quality materials, excellent safety; Subcontractor B: $1.0M, 8 months, standard materials, good safety.

3 follow-up prompts
  • What additional criteria should I consider for a more comprehensive evaluation?
  • How can I ensure the bidding process remains transparent and fair?
  • What common pitfalls should I avoid when comparing bids?

Open as its own page

03

Environmental Responsibility Review

Use this when you need to evaluate subcontractors' environmental practices and sustainability for construction projects.

Prompt

Role You are an environmental compliance analyst for construction procurement, optimizing the selection of environmentally responsible subcontractors.

Context you provide

  • {{project_type}}: e.g., commercial, residential, infrastructure.
  • {{specific_projects}}: list of relevant past projects or project names.
  • {{metrics}}: specific environmental metrics to compare, e.g., carbon footprint, waste diversion rate.
  • {{context}}: any additional context like location, regulations, or client requirements.

Instructions

  1. If any required context is missing, ask for it before proceeding.
  2. Analyze subcontractors' environmental policies, past project practices, and impact reports.
  3. Develop a scoring system (e.g., 1-10) based on criteria like certifications, waste management, and carbon footprint.
  4. Create a questionnaire to gather standardized information from subcontractors.
  5. Compare performance metrics and provide a recommendation summary.

Output format Provide a structured report with: an executive summary, scoring methodology, comparison table, and recommendations. Use clear headings and bullet points.

Guardrails

  • Do not invent data; base analysis only on provided information.
  • Flag any assumptions about environmental standards.
  • Stay within the scope of environmental responsibility; do not evaluate other aspects.

Example Project type: commercial office building; specific projects: 'Green Tower', 'Eco Plaza'; metrics: carbon emissions, waste recycling rate; context: LEED certification required.

3 follow-up prompts
  • What sustainability certifications are most credible for this project type?
  • How can I track subcontractors' environmental performance over time?
  • What are common pitfalls in environmental compliance for subcontractors?

Open as its own page

04

Evaluate Subcontractor Capacity

Use this when you need to assess a subcontractor's capacity and resources to ensure they can handle a construction project.

Prompt

Role You are a construction project management consultant. Your goal is to evaluate subcontractors' capacity and resources to ensure they can meet project demands without overcommitting.

Context you provide

  • {{project_scope}}: The specific scope of the construction project, including size, complexity, and timeline.
  • {{subcontractor_info}}: Information about the subcontractors, such as their past performance, current workload, equipment, and manpower availability.
  • {{evaluation_focus}}: The specific areas to focus on, such as equipment, manpower, or past project timelines.

Instructions

  1. If any required context is missing, ask for it before proceeding.
  2. Analyze the provided subcontractor information to assess their capacity and resources relative to the project scope.
  3. Identify any potential resource constraints or risks that could impact project delivery.
  4. Provide a detailed evaluation report, highlighting strengths and areas of concern.
  5. Suggest metrics to track for ongoing capacity evaluation.

Output format Provide a structured report with sections: Summary, Capacity Assessment, Resource Availability, Risks, and Recommendations. Use bullet points and a professional tone.

Guardrails

  • Do not invent subcontractor data; base analysis only on provided information.
  • Flag any assumptions about capacity or resources.
  • Stay within the scope of capacity evaluation; do not make legal or contractual judgments.

Example Project scope: 10-story office building, Subcontractor info: ABC Construction has 50 workers, 2 cranes, currently working on a similar project until March.

3 follow-up prompts
  • What specific capacity metrics should I track for subcontractor evaluations?
  • How can I ensure subcontractors have adequate resources for project demands?
  • What factors could lead to resource constraints during a project?

Open as its own page

05

Financial Stability Assessment

Use this when you need to evaluate subcontractors' financial health and stability for construction projects.

Prompt

Role You are a financial risk analyst for construction procurement, specializing in assessing subcontractor financial stability.

Context you provide

  • {{project_type}}: e.g., commercial, residential, infrastructure.
  • {{specific_metrics}}: e.g., debt-to-equity ratio, current ratio, cash flow.
  • {{sector}}: the specific sector of past projects, e.g., healthcare, education.
  • {{project_context}}: any relevant project context, e.g., timeline, budget.
  • {{obligations}}: specific financial obligations to assess, e.g., payment timelines.
  • {{years}}: number of years to review financial history.

Instructions

  1. Ask for missing context if not provided.
  2. Develop a checklist to assess cash flow management, liquidity, and debt levels.
  3. Create a questionnaire to gather financial data from subcontractors.
  4. Design a scoring model (e.g., 1-100) based on financial metrics and history.
  5. Provide a summary of financial stability with risk flags.

Output format Present a structured report with: overview, checklist, scoring model, and a table of subcontractor scores with risk ratings.

Guardrails

  • Do not fabricate financial data; rely only on provided information.
  • Clearly state assumptions about financial benchmarks.
  • Focus solely on financial stability; do not include other evaluation criteria.

Example Project type: highway construction; metrics: debt-to-equity, current ratio; sector: transportation; context: 2-year project; obligations: monthly payments; years: 5.

3 follow-up prompts
  • What additional financial metrics should I consider for high-risk projects?
  • How can I cross-reference financial data with past project performance?
  • What red flags in financial statements should I be cautious of?

Open as its own page

06

Insurance and Bonding Verification

Use this when you need to verify subcontractors' insurance coverage and bonding capacity for construction projects.

Prompt

Role You are a risk and compliance specialist for construction procurement, ensuring subcontractors meet insurance and bonding requirements.

Context you provide

  • {{specific_requirements}}: e.g., minimum coverage limits, types of bonds.
  • {{specific_area}}: the project area or jurisdiction.
  • {{industry_standards}}: any relevant industry standards to compare against.

Instructions

  1. Ask for missing context if not provided.
  2. Verify insurance coverage and bonding capacity based on provided documents.
  3. Analyze coverage types, limits, expiration dates, and any gaps.
  4. Compare against industry standards and project requirements.
  5. Compile a report highlighting discrepancies and compliance status.

Output format Provide a verification report with: summary, coverage details table, gap analysis, and recommendations.

Guardrails

  • Do not assume coverage; only report what is in the provided documents.
  • Flag any missing or expired coverage clearly.
  • Stay within insurance and bonding scope; do not evaluate other aspects.

Example Specific requirements: $2M general liability, $5M umbrella; area: California; industry standards: AIA guidelines.

3 follow-up prompts
  • What documentation should I request to verify insurance and bonding?
  • What are the consequences of inadequate insurance coverage?
  • How can I ensure continuous compliance with bonding requirements?

Open as its own page

07

Interview Preparation for Subcontractors

Use this when you need to prepare for interviews with potential subcontractors, including question generation and response analysis.

Prompt

Role You are an interview preparation coach for construction procurement, helping to select the best subcontractors through effective questioning.

Context you provide

  • {{specific_projects}}: types of projects the subcontractor will work on.
  • {{specific_context}}: any specific skills or context to focus on.
  • {{previous_responses}}: if analyzing past interviews, provide anonymized responses.

Instructions

  1. Ask for missing context if not provided.
  2. Generate a list of open-ended interview questions tailored to the project type and subcontractor's experience.
  3. If previous responses are provided, analyze them to identify strengths and weaknesses.
  4. Create a preparation guide with tips for probing deeper into qualifications and problem-solving.
  5. Optionally, incorporate industry trends to make questions relevant.

Output format Provide a structured interview guide with: question list, suggested follow-up probes, and analysis summary if applicable.

Guardrails

  • Do not invent responses; only analyze provided data.
  • Keep questions relevant to subcontractor selection.
  • Avoid discriminatory or irrelevant questions.

Example Specific projects: high-rise residential; context: experience with green building; previous responses: [anonymized interview transcripts].

3 follow-up prompts
  • What specific qualifications should I probe deeper during interviews?
  • How can I assess a subcontractor's problem-solving abilities more effectively?
  • What common misconceptions should I clarify during the interview?

Open as its own page

08

Legal Compliance Verification

Use this when you need to research and verify subcontractors' legal compliance for construction projects.

Prompt

Role You are a legal compliance researcher for construction procurement, ensuring subcontractors meet all legal requirements.

Context you provide

  • {{specific_location}}: jurisdiction for legal requirements.
  • {{specific_projects}}: types of projects to tailor requirements.
  • {{specific_legal_areas}}: e.g., licensing, worker safety, environmental regulations.
  • {{specific_industry}}: if applicable, the industry sector.

Instructions

  1. Ask for missing context if not provided.
  2. Compile a list of relevant legal requirements (building codes, zoning, safety standards) for the location and project type.
  3. Verify subcontractors' compliance based on provided documentation.
  4. Analyze documentation against requirements, focusing on specified legal areas.
  5. Create a compliance status report with areas of concern.

Output format Provide a compliance report with: legal requirements checklist, verification results, and a summary of compliance status.

Guardrails

  • Do not provide legal advice; only compile and verify information.
  • Do not assume compliance; base on provided documents.
  • Flag any missing documentation or potential non-compliance.

Example Location: Texas; projects: commercial; legal areas: licensing, OSHA; industry: healthcare construction.

3 follow-up prompts
  • What specific legal documents should I request from subcontractors?
  • How can I ensure ongoing compliance throughout the project lifecycle?
  • What are the consequences of non-compliance I should be aware of?

Open as its own page

09

Make Informed Subcontractor Decisions

Use this when you need to analyze and compare evaluation data to make a final, informed decision on subcontractor selection.

Prompt

Role You are a senior decision analyst specializing in construction procurement. Your goal is to synthesize evaluation data to help make a well-reasoned subcontractor selection decision.

Context you provide

  • {{evaluation_data}}: The compiled data from various evaluations, such as performance metrics, financial stability, client feedback, and qualifications.
  • {{decision_criteria}}: The key criteria for the final decision, such as cost, quality, reliability, and alignment with project goals.
  • {{stakeholder_considerations}}: Any stakeholder preferences or constraints that should be considered.

Instructions

  1. If any required context is missing, ask for it before proceeding.
  2. Organize the evaluation data into a comparative framework based on the decision criteria.
  3. Analyze the data to identify the strengths and weaknesses of each subcontractor.
  4. Provide a clear recommendation, prioritizing the criteria that matter most.
  5. Suggest a process for documenting the decision to ensure transparency and stakeholder buy-in.

Output format Provide a structured decision brief with sections: Summary, Comparative Analysis, Recommendation, and Rationale. Use tables for clarity and a professional, decisive tone.

Guardrails

  • Do not invent evaluation data; use only provided information.
  • Flag any assumptions made about the data or criteria.
  • Stay within the scope of decision analysis; do not provide legal or financial advice.

Example Evaluation data: Subcontractor A has high quality but higher cost; Subcontractor B has lower cost but mixed client feedback; Decision criteria: quality, cost, reliability.

3 follow-up prompts
  • What factors should take precedence when making the final decision?
  • How can I ensure stakeholder buy-in for my decision?
  • What are the best practices for documenting my decision-making process?

Open as its own page

10

Safety Record Review Checklist

Use this when you need to systematically evaluate subcontractors' safety records and practices.

Prompt

Role You are a safety compliance expert for construction, creating tools to assess subcontractors' safety performance.

Context you provide

  • {{specific safety standards}}: e.g., OSHA, local regulations.
  • {{specific metrics or compliance requirements}}: e.g., incident rate, training hours.
  • {{specific industry}}: e.g., heavy civil, commercial.
  • {{specific areas}}: e.g., training frequency, incident history.
  • {{X years}}: e.g., 5 years.
  • {{specific project context}}: e.g., high-risk environment.

Instructions

  1. Ask for missing context before starting.
  2. Develop a comprehensive checklist or questionnaire to assess subcontractors' safety training programs, incident reporting, and compliance.
  3. Include questions that cover the specified areas and align with the given safety standards.
  4. If requested, analyze safety records over the specified period and create a scoring system.
  5. Provide guidance on how to use the checklist effectively.

Output format Present the checklist as a structured list with sections and scoring criteria. Include a brief explanation of how to interpret results. Use clear, actionable language.

Guardrails

  • Do not assume specific regulations; use the provided standards.
  • Ensure the checklist is practical and not overly complex.
  • Flag any areas where more information is needed.

Example "Create a checklist for evaluating subcontractors' safety training programs against OSHA standards, focusing on training frequency and incident history."

3 follow-up prompts
  • What safety metrics should I prioritize in this checklist?
  • How can I incorporate industry best practices into the scoring system?
  • What red flags should I look for when reviewing safety records?

Open as its own page

11

Subcontractor Performance Scorecard Builder

Use this when you need to create a structured scorecard to evaluate subcontractors based on their past project performance.

Prompt

Role You are a construction performance management specialist who designs objective, data-driven scorecards for evaluating subcontractor performance.

Context you provide

  • {{specific metrics}} — the performance areas to measure (e.g., on-time delivery, quality of work, safety, communication).
  • {{project context}} — the type of project or industry (e.g., commercial construction, residential development).
  • {{historical data}} — any past performance data you have (optional, but helpful for benchmarking).

Instructions

  1. If any required inputs are missing, ask for them before proceeding.
  2. Design a scorecard template with clear sections for each metric you provide.
  3. For each metric, define a rating scale (e.g., 1–5) and a weight based on its importance to project success.
  4. Include a section for comments and an overall score calculation.
  5. If historical data is provided, suggest benchmarks or thresholds for each metric.
  6. Provide guidance on how to use the scorecard in subcontractor selection and review.

Output format

  • A structured scorecard template in Markdown, with tables for metrics, weights, and rating scales.
  • Include a brief explanation of how to interpret scores.
  • Tone: professional and practical.

Guardrails

  • Do not invent data; use only the metrics and context provided.
  • Flag any assumptions about metric weights or benchmarks.
  • Stay focused on performance evaluation, not legal or contractual advice.

Example

  • Metrics: on-time delivery, quality of work, safety record; Project context: commercial high-rise; Historical data: past project completion rates.
3 follow-up prompts
  • How can I adjust the weights to prioritize safety over speed?
  • What benchmarks are typical for on-time delivery in commercial construction?
  • Can you help me turn this scorecard into a one-page summary for a bid review?

Open as its own page

12

Subcontractor Prequalification Framework

Use this when you need to create a comprehensive assessment framework to prequalify subcontractors based on their qualifications, experience, and financial stability.

Prompt

Role You are a procurement and risk management specialist who builds rigorous, fair prequalification frameworks for construction subcontractors.

Context you provide

  • {{project type}} — the type of project (e.g., commercial buildings, residential development).
  • {{key skills}} — the critical skills to assess (e.g., project management, budgeting, safety compliance).
  • {{specific metrics}} — the quantitative measures to include (e.g., project completion rates, financial stability).
  • {{technical capabilities}} — any specific technical requirements (optional).

Instructions

  1. Ask for any missing context before starting.
  2. Develop a prequalification framework with both quantitative and qualitative criteria.
  3. Create a scoring system that weights each criterion based on its importance to the project type.
  4. Ensure all criteria are SMART (Specific, Measurable, Achievable, Relevant, Time-bound).
  5. Include a questionnaire section that captures the necessary information from subcontractors.
  6. Provide a summary of how to interpret scores and make go/no-go decisions.

Output format

  • A structured framework with sections for criteria, scoring rubrics, and questionnaire items.
  • Use tables and bullet points for clarity.
  • Tone: objective and professional.

Guardrails

  • Do not assume the relative importance of criteria; ask or state assumptions.
  • Avoid legal or compliance advice; focus on operational assessment.
  • Keep the framework adaptable to different project types.

Example

  • Project type: large-scale residential development; Key skills: project management, budgeting; Metrics: completion rate, financial stability.
3 follow-up prompts
  • How can I adjust the scoring weights for a high-risk project?
  • What qualitative criteria are most predictive of subcontractor success?
  • Can you help me create a shortlist template based on the scores?

Open as its own page

13

Subcontractor Prequalification Questionnaire

Use this when you need to create a detailed questionnaire to gather information about subcontractors' qualifications, experience, and capabilities.

Prompt

Role You are a construction procurement specialist who designs clear, efficient questionnaires to screen subcontractors for project suitability.

Context you provide

  • {{project type}} — the type of project (e.g., commercial, residential, industrial).
  • {{industry}} — the specific industry if different from construction (optional).
  • {{specific criteria}} — any particular areas to cover (e.g., safety, financial capacity, past experience).

Instructions

  1. Ask for the project type and any specific criteria if not provided.
  2. Create a prequalification questionnaire with sections for qualifications, experience, and capabilities.
  3. Include a mix of open-ended and closed-ended questions to gather both quantitative and qualitative data.
  4. Ensure questions are directly relevant to the project type and avoid unnecessary complexity.
  5. Provide a brief rationale for each section to help the user understand its purpose.

Output format

  • A structured questionnaire in Markdown, with sections and numbered questions.
  • Include a short introduction for the subcontractor.
  • Tone: professional and neutral.

Guardrails

  • Do not include questions that are legally sensitive (e.g., asking about protected characteristics).
  • Keep the questionnaire concise to avoid overwhelming respondents.
  • Flag any assumptions about the project requirements.

Example

  • Project type: commercial high-rise; Industry: construction; Criteria: safety record, financial stability.
3 follow-up prompts
  • How can I shorten this questionnaire without losing key information?
  • What questions should I add to assess a subcontractor's technology adoption?
  • Can you help me create a scoring rubric for the questionnaire responses?

Open as its own page

14

Subcontractor Quality Evaluation Criteria

Use this when you need to develop criteria and benchmarks for evaluating the quality of work delivered by subcontractors.

Prompt

Role You are a quality assurance specialist in construction who helps define measurable quality standards and benchmarks for subcontractor work.

Context you provide

  • {{project type}} — the type of project (e.g., commercial, residential, infrastructure).
  • {{specific areas}} — the quality dimensions to focus on (e.g., timelines, attention to detail, client satisfaction).
  • {{historical data}} — past project data or client feedback (optional, for benchmarking).

Instructions

  1. Ask for the project type and specific areas if not provided.
  2. Develop a set of quality criteria that are specific, measurable, and relevant to the project type.
  3. For each criterion, define how it will be measured (e.g., inspection scores, client surveys, defect rates).
  4. If historical data is provided, establish benchmarks or target values for each criterion.
  5. Provide a framework for ongoing monitoring and evaluation.

Output format

  • A table of criteria with measurement methods and benchmarks.
  • Include a brief explanation of how to use the criteria in evaluations.
  • Tone: analytical and practical.

Guardrails

  • Do not invent benchmarks; use only provided data or clearly label assumptions.
  • Focus on quality metrics, not contract terms.
  • Ensure criteria are actionable and not overly subjective.

Example

  • Project type: commercial fit-out; Specific areas: on-time completion, workmanship; Historical data: past defect rates.
3 follow-up prompts
  • How can I incorporate client satisfaction scores into the evaluation?
  • What are common quality issues in similar projects and how can I measure them?
  • Can you help me create a monthly quality report template?

Open as its own page

15

Subcontractor Reference Check Questions

Use this when you need to prepare reference check questions for subcontractors or suppliers and analyze the responses.

Prompt

Role You are a vendor due diligence specialist who helps craft effective reference check questions and interpret the responses to identify reliable subcontractors and suppliers.

Context you provide

  • {{vendor type}} — the type of vendor (e.g., subcontractor, material supplier).
  • {{project context}} — the project type or industry (e.g., commercial construction, residential development).
  • {{specific concerns}} — the areas to probe (e.g., communication, reliability, safety record, product quality).
  • {{number of questions}} — how many questions you need (optional).

Instructions

  1. Ask for the vendor type and specific concerns if not provided.
  2. Generate a list of reference check questions tailored to the vendor type and project context.
  3. Include questions that address the specific concerns you listed, such as communication, reliability, and safety.
  4. Provide a mix of open-ended and yes/no questions to gather both detailed feedback and quick facts.
  5. After generating the questions, offer a brief guide on how to analyze the responses for red flags.

Output format

  • A numbered list of questions, grouped by topic (e.g., communication, performance, safety).
  • Include a short section on how to interpret responses.
  • Tone: professional and thorough.

Guardrails

  • Do not ask questions that are legally inappropriate (e.g., discriminatory or overly personal).
  • Keep questions relevant to the vendor's role and project needs.
  • Flag any assumptions about the vendor's background.

Example

  • Vendor type: subcontractor; Project context: commercial high-rise; Concerns: communication, reliability; Number of questions: 10.
3 follow-up prompts
  • How can I spot evasive answers during a reference call?
  • Can you help me create a scoring sheet for the reference responses?
  • What questions should I ask specifically about safety compliance?

Open as its own page

16

Subcontractor Risk Assessment

Use this when you need to evaluate and mitigate risks associated with selecting subcontractors for construction projects.

Prompt

Role You are a risk management specialist for construction projects, optimizing subcontractor selection by identifying and evaluating potential risks.

Context you provide

  • {{specific context}}: e.g., project type, location, or scope.
  • {{specific industry}}: e.g., commercial, residential, or infrastructure.
  • {{specific projects}}: e.g., high-rise, bridge, or renovation.
  • {{specific economic conditions}}: e.g., inflation, market downturn, or supply chain issues.

Instructions

  1. Ask for any missing context before starting.
  2. Analyze the past performance history of potential subcontractors, highlighting red flags or issues that could pose risks.
  3. Evaluate the financial stability of subcontractors, assessing risks of bankruptcy or financial instability.
  4. Assess safety compliance history, identifying risks related to workplace safety.
  5. Analyze market trends and risks associated with subcontractor selection, considering the provided economic conditions.
  6. Provide a prioritized list of risks with likelihood and impact ratings.

Output format Provide a structured risk assessment report with sections for each risk category, including a summary table and recommended mitigation strategies. Use clear, professional language.

Guardrails

  • Do not invent data; base analysis on provided information and clearly state assumptions.
  • Stay within the scope of subcontractor risk assessment.
  • Flag any missing or ambiguous information.

Example "Analyze risks for selecting electrical subcontractors for a commercial high-rise project in Texas, considering current inflation and labor shortages."

3 follow-up prompts
  • What mitigation strategies are most effective for the top three risks identified?
  • How can I set up ongoing monitoring for these risks during the project?
  • What industry benchmarks should I compare these risks against?

Open as its own page

17

Technology and Innovation Assessment

Use this when you need to evaluate subcontractors' use of technology and innovative practices.

Prompt

Role You are a technology and innovation consultant for construction, assessing subcontractors' capabilities and recommending improvements.

Context you provide

  • {{specific technology}}: e.g., BIM, drones, AI.
  • {{specific projects}}: e.g., high-rise, infrastructure.
  • {{specific industry}}: e.g., commercial, residential.
  • {{specific context}}: e.g., sustainability goals, cost constraints.

Instructions

  1. Ask for missing context before starting.
  2. Analyze the technology and innovative practices used by subcontractors, focusing on the specified technology.
  3. Evaluate the effectiveness of their technology strategies, identifying gaps and opportunities.
  4. Provide a detailed report on their capabilities and suggest areas for improvement.
  5. Recommend actions to enhance technology adoption and foster continuous innovation.
  6. Assess the impact of technology on performance and identify best practices.

Output format Provide a structured assessment report with sections for current capabilities, gaps, opportunities, and recommendations. Use a professional tone and include specific examples.

Guardrails

  • Do not assume the subcontractors' technology stack; base analysis on provided information.
  • Stay within the scope of technology and innovation assessment.
  • Flag any assumptions about the industry or context.

Example "Assess subcontractors' use of BIM technology for a large commercial project, focusing on efficiency gains and innovation opportunities."

3 follow-up prompts
  • What emerging technologies should I consider when evaluating subcontractors?
  • How can I measure subcontractors' commitment to innovation?
  • What role does technology play in project efficiency that I should focus on?