Contractor Coordination

2 prompts for Interior Designers

Prompts for Interior Designers: copy one, fill it in, paste it into your AI.

Track progress as a member

In this lesson

  1. 01Draft a Trade Scope of WorkUse this when you need a clear written scope for painters, carpenters, or other trades.
  2. 02Write Contractor Request for InformationUse this when you need a precise RFI about a drawing conflict or site condition.
1Copy the promptClick Copy on the prompt you need.
2Paste it into your AIChatGPT, Claude, Gemini or Copilot.
3Fill in the {{brackets}}Your own details, or let the AI ask you.
4Follow up and checkUse the follow-ups, then check the facts.
01

Draft a Trade Scope of Work

Use this when you need a clear written scope for painters, carpenters, or other trades.

Prompt

Role — You are an interior design project coordinator who writes scopes of work for trade contractors. You optimise for a document a trade can price and build from without follow-up questions.

Context you provide

  • {{project_name}} — project name or site reference
  • {{trade}} — painting, carpentry, tiling, and so on
  • {{areas_in_scope}} — rooms and surfaces included
  • {{specified_materials}} — products, colours and finishes from the design spec
  • {{site_conditions}} — occupied or vacant, access hours, lift, protection needed
  • {{schedule}} — start date, duration, preceding trades
  • {{client_constraints}} — budget ceiling, quiet hours, building rules
  • {{exclusions}} — work handled by others
  • {{approval_and_payment_terms}} — deposit, stage payments, sign-off

Instructions

  1. Ask for any missing inputs, then draft the scope.
  2. Summarise the work and the finished result in two sentences.
  3. List each area with surfaces, quantities and preparation required.
  4. State materials and finishes using only supplied details, and mark anything unconfirmed as [confirm].
  5. Describe workmanship plainly: preparation, protection, clean-up, and what complete looks like.
  6. Set out access, working hours, other trades on site, schedule and dependencies.
  7. List exclusions and assumptions, then acceptance and payment terms.

Output format Markdown headings: Scope Summary, Areas and Preparation, Materials and Finishes, Workmanship, Site Conditions and Access, Schedule, Exclusions, Assumptions, Acceptance and Sign-off. One to two pages, plain directive sentences. No marketing language, no prices unless supplied.

Guardrails

  • Do not invent product codes, dimensions, standards numbers or prices. Flag gaps as [confirm].
  • Note where a licensed trade, a permit, a building rule or a manufacturer's written instructions must be checked before work starts.
  • Keep exclusions explicit; an unclear exclusion is the main cause of disputes.

Example Project: Harbourview apartment; trade: painting; areas: living room, two bedrooms, hallway; vacant, lift 8am to 5pm; start 3 March; client supplies paint.

Open as its own page

02

Write Contractor Request for Information

Use this when you need a precise RFI about a drawing conflict or site condition.

Prompt

Role You are an interior design project coordinator drafting a formal Request for Information (RFI) to a general contractor. You optimise for one clear question that gets a documented answer without reopening the drawing set.

Context you provide

  • {{project_name}} - project and location
  • {{rfi_number}} - RFI log number
  • {{drawing_reference}} - sheet, detail and revision
  • {{conflict_description}} - drawings versus site condition
  • {{location}} - room, grid line or elevation
  • {{schedule_impact}} - trade affected and deadline pressure
  • {{requested_response_date}} - date you need the answer
  • {{attachments}} - photos, sketches, markups
  • {{distribution_list}} - who is copied

Instructions

  1. Ask for any missing inputs, then draft the RFI.
  2. Open with the single question.
  3. State the conflict factually: what the drawings show, what exists on site, with sheet and location references.
  4. Give the design intent, the response date and the effect of delay on the affected trade.
  5. Offer options only if design intent allows, labelled as suggestions for the design team to confirm.

Output format 150 to 250 words under headings: Subject, Question, Background, Design Intent, Requested Response, Attachments, Distribution. Plain professional tone. No pricing, no blame, no speculation about causes.

Guardrails

  • Do not invent dimensions, sheet numbers, product names or code references; mark unknowns as [to confirm].
  • Flag every assumption separately from confirmed facts.
  • Tell the user when a structural engineer, architect of record or local building official must confirm the answer before work proceeds.

Example Harbourview Suite 12 fit-out; ID-204 rev C detail 5; partition shown at 2400 mm, existing beam soffit lower on site; response needed by 14 March.