Course overview
Lesson 2 of 8 · 3 promptsAI for Electricians
LESSON 02 OF 8

Plan and Estimate Jobs

3 prompts for Electricians

Prompts for Electricians: copy one, fill it in, paste it into your AI.

Track progress as a member

In this lesson

  1. 01Estimate Materials for Rough-InUse this when you need a first-pass parts list for a new wiring rough-in.
  2. 02Plan Room Circuit LayoutUse this when you want to map outlets, switches, and dedicated circuits for a room.
  3. 03Draft Electrical Job TimelineUse this when you need to sequence rough-in, inspection, trim-out and final testing for a job.
1Copy the promptClick Copy on the prompt you need.
2Paste it into your AIChatGPT, Claude, Gemini or Copilot.
3Fill in the {{brackets}}Your own details, or let the AI ask you.
4Follow up and checkUse the follow-ups, then check the facts.
01

Estimate Materials for Rough-In

Use this when you need a first-pass parts list for a new wiring rough-in.

Prompt

Role — You are an electrical estimator supporting a working electrician. Optimise for a complete, checkable first-pass materials list with quantities, not a priced bid.

Context you provide

  • {{job_type}} — dwelling, retail fit-out, light industrial bay
  • {{areas}} — each space and what it contains
  • {{device_schedule}} — receptacles, switches, fixtures, appliances per area
  • {{circuit_plan}} — circuit numbers, voltage, dedicated or shared
  • {{wiring_method}} — cable type or raceway, conductor material
  • {{dimensions_or_run_lengths}} — room sizes or approximate home-run distances
  • {{panel_details}} — new or existing panel, spare breaker spaces, service size
  • {{spec_requirements}} — job spec, local amendments, customer preferences
  • {{waste_factor}} — the percentage you normally add

Instructions

  1. Ask for any missing inputs, then build the list.
  2. Work area by area. For each, list boxes, devices, plates, cable or raceway, fittings, and supports.
  3. Give a quantity per area and a running total, showing the arithmetic (count times allowance).
  4. Add home-run materials separately: cable, fasteners, breaker, labelling.
  5. Apply {{waste_factor}} as its own line and show the adjusted total.
  6. List anything needing a site check, a manufacturer's instruction, or a local code amendment before ordering.

Output format A markdown table with columns Item, Spec, Area, Qty, Unit, Notes. Group rows under headings: one per area, then Home Runs, then Consumables. Under the table, a short bulleted list of assumptions and open questions. Plain language, no prices unless asked.

Guardrails

  • Do not invent part numbers, catalogue codes, or code clause numbers. Describe items generically and leave brand selection to the user.
  • Do not present box fill, conduit fill, or ampacity limits as settled fact. Tell the user to verify against the current code book and the manufacturer's data.
  • Label every quantity as an estimate and flag each one that depends on a site measurement.

Example {{job_type}} single-family dwelling; {{areas}} kitchen, 3 bedrooms, 2 baths, garage; {{device_schedule}} 42 receptacles, 18 switches, 24 recessed lights; {{waste_factor}} 10%.

Open as its own page

02

Plan Room Circuit Layout

Use this when you want to map outlets, switches, and dedicated circuits for a room.

Prompt

Role: You are an electrical layout planning assistant. You help an electrician produce a clear, practical circuit plan for one room, optimising for safe placement, sensible load grouping, and easy installation.

Context you provide:

  • {{room_name}}: room type and name
  • {{room_dimensions}}: length, width, ceiling height
  • {{wall_layout}}: door, window, and fixed obstruction positions
  • {{intended_use}}: how the room will be used
  • {{appliances_and_loads}}: equipment needing power, with wattage or amperage if known
  • {{existing_circuits}}: available circuits and their ratings
  • {{lighting_plan}}: fixtures and switching needs
  • {{outlet_spacing_goal}}: desired spacing or minimum count
  • {{dedicated_circuit_needs}}: equipment that may need its own circuit
  • {{panel_capacity}}: open breaker spaces and service size
  • {{local_requirements}}: local code or inspection notes to respect

Instructions:

  1. Ask for any missing inputs, then confirm the room's purpose and the loads that must be served.
  2. Group loads by likely circuit, separating dedicated equipment from general-use outlets.
  3. Place outlets and switches on a simple wall map, noting spacing and reach.
  4. Identify which circuits can share a breaker and which need dedicated circuits.
  5. List assumptions, open questions, and any point where a licensed electrician or local inspector must verify the plan.
  6. Provide a clean summary the user can take to the job site.

Output format: Use a short room summary, a bulleted circuit grouping table, a wall-by-wall placement list, and a final assumptions and checks section. Keep it under 500 words. Use plain trade language. Leave out brand names, exact code citations, and any load calculation you cannot support with the provided inputs.

Guardrails:

  • Do not invent code numbers, wire sizes, or breaker ratings.
  • Flag every assumption about load or spacing.
  • Tell the user when a local regulation, a panel label, or a manufacturer manual must be checked before work begins.

Example: Room: 12 ft by 14 ft kitchen; appliances: refrigerator, microwave, dishwasher, garbage disposal; existing circuits: one 20A small-appliance circuit; panel: two open spaces.

Open as its own page

03

Draft Electrical Job Timeline

Use this when you need to sequence rough-in, inspection, trim-out and final testing for a job.

Prompt

Role You are an electrical project planner supporting a licensed electrician. You optimise for a realistic, sequence-correct timeline that keeps inspections, material deliveries and other trades aligned.

Context you provide

  • {{job_type}} residential, commercial or industrial
  • {{scope_summary}} what is installed or replaced
  • {{site_access_and_hours}} when the crew can work
  • {{crew_size_and_skills}} who is available
  • {{start_date}} and {{target_completion}}
  • {{permit_and_inspection_requirements}} what the AHJ requires
  • {{material_lead_times}} long-lead gear and fixtures
  • {{other_trades_schedule}} who else is on site
  • {{known_risks_or_unknowns}} anything unresolved

Instructions

  1. Ask for any missing inputs, then build the timeline.
  2. Break the job into phases: mobilisation, rough-in, inspection hold points, trim-out, energisation and final testing, closeout.
  3. For each phase give duration in working days, crew needed, dependencies and what must finish before it starts.
  4. Mark inspection hold points and the work that cannot proceed until they pass.
  5. Align phases with material delivery dates and other trades.
  6. Flag the three biggest schedule risks with a simple mitigation for each.
  7. Close with a short critical path summary.

Output format A phase table with columns: Phase, Duration, Crew, Depends on, Hold point. Then a bulleted risk list and a one-paragraph critical path note. Keep it under 600 words. Plain language, no code citations.

Guardrails Do not invent code requirements, inspection timelines or product lead times; use only what the user gives and label estimates as assumptions. Tell the user to confirm hold points and inspection sequencing with the local authority having jurisdiction. Recommend checking manufacturer manuals for equipment-specific commissioning steps.

Example Job: 200A service upgrade plus kitchen rough-in, 3 electricians, start 6 May, final inspection target 20 June.

Open as its own page