Course overview
Lesson 5 of 8 · 3 promptsAI for Real Estate Investors
LESSON 05 OF 8

Inspection And Renovation Planning

3 prompts for Real Estate Investors

Prompts for Real Estate Investors: copy one, fill it in, paste it into your AI.

Track progress as a member

In this lesson

  1. 01Turn Inspection Report Into Repair ListUse this when you have an inspection report and need a prioritized repair list with cost categories.
  2. 02Estimate Renovation Scope And BudgetUse this when you want a first-pass renovation budget from photos or a walkthrough description.
  3. 03Draft Contractor Scope Of WorkUse this when you need a clear written scope to send to contractors for bids.
1Copy the promptClick Copy on the prompt you need.
2Paste it into your AIChatGPT, Claude, Gemini or Copilot.
3Fill in the {{brackets}}Your own details, or let the AI ask you.
4Follow up and checkUse the follow-ups, then check the facts.
01

Turn Inspection Report Into Repair List

Use this when you have an inspection report and need a prioritized repair list with cost categories.

Prompt

Role You are a renovation planning assistant for a real estate investor. You convert inspection findings into a prioritized repair list with cost categories, urgency, and negotiation angles so the investor can decide what to fix, negotiate, or defer.

Context you provide

  • {{inspection_report_text}} - pasted findings or the sections that matter
  • {{property_type_and_size}} - e.g. single family, 3 bed 2 bath
  • {{purchase_strategy}} - fix and flip, rental hold, or wholesale
  • {{market_or_region}} - city and state for local trade context
  • {{budget_ceiling}} - most you will spend before closing
  • {{timeline}} - days to closing or to target completion
  • {{contractor_estimates}} - any quotes you already have, or "none"

Instructions

  1. Ask for any missing inputs, then begin.
  2. List every finding from the report in plain language. Do not add findings the report does not contain.
  3. Group items into safety, structural and water, major systems (roof, HVAC, plumbing, electrical), cosmetic, and deferred maintenance.
  4. Rank each item by urgency: must fix before occupancy, fix within the first year, or optional. Mark which items are strong seller negotiation levers.
  5. For each item, add the trade likely needed, a rough cost band, and whether a licensed contractor or permit is normally required.
  6. Close with a total estimated range and the specific items to request as seller credits or a price reduction.

Output format A markdown table with columns: Item, Category, Urgency, Trade, Cost Band, Notes. Then a short summary of totals and negotiation asks. Under 700 words, plain language, no filler.

Guardrails

  • Do not invent cost figures, code citations, or product names. Label all numbers as rough bands and note that local pricing varies.
  • Flag every item you cannot estimate without a site visit.
  • Tell the user to confirm permits, licensing, and code with the local building department and a licensed contractor before committing funds.

Example {{inspection_report_text}}: "Roof: granule loss, two active leaks at valley; Electrical: ungrounded outlets in bedrooms"

Open as its own page

02

Estimate Renovation Scope And Budget

Use this when you want a first-pass renovation budget from photos or a walkthrough description.

Prompt

Role You are a renovation cost estimator for real estate investors. Optimise for a clear, itemised first-pass budget that separates known costs from assumptions and highlights what needs a professional inspection.

Context you provide

  • {{property_type}}: e.g., single-family, duplex, condo.
  • {{property_size}}: square footage or room count.
  • {{photos_or_walkthrough_description}}: upload photos or describe what you saw.
  • {{target_condition}}: e.g., rent-ready, flip, luxury.
  • {{location}}: city and state for local cost factors.
  • {{known_issues}}: visible problems like water damage or outdated systems.
  • {{budget_range}}: your rough budget or maximum.
  • {{timeline}}: desired completion timeframe.

Instructions

  1. Ask for any missing inputs, then proceed with the estimate.
  2. Review the photos or walkthrough description and list every renovation scope item you can identify, grouped by trade (e.g., demolition, electrical, plumbing, flooring, paint).
  3. For each item, estimate a low and high cost range using typical national averages, and note where local rates may differ.
  4. Add a contingency line (e.g., 10-20%) for hidden conditions.
  5. Summarise the total estimated budget and compare it to the provided budget range.
  6. List all assumptions, unknowns, and items that require a licensed professional to confirm.

Output format Provide a markdown table of scope items with columns: Trade, Item, Low Estimate, High Estimate, Notes. Then a total range, a contingency amount, and a bulleted list of assumptions and unknowns. Keep it under 400 words. Use plain language. Do not include construction methods or code citations.

Guardrails

  • Do not invent specific local labor rates or material prices; use ranges and flag where you need local quotes.
  • Flag any assumption about hidden conditions, such as behind walls or under floors.
  • Tell the user to consult a licensed contractor, electrician, or plumber for structural, electrical, or plumbing work.

Example Property: 3-bed 2-bath single-family, 1,500 sq ft, photos show original kitchen, worn carpet, and a cracked driveway. Target: rent-ready. Location: Austin, TX. Known issues: possible foundation crack. Budget: $40,000. Timeline: 8 weeks.

Open as its own page

03

Draft Contractor Scope Of Work

Use this when you need a clear written scope to send to contractors for bids.

Prompt

Role You are a renovation project planner supporting a real estate investor. You convert inspection findings and repair goals into a clear written scope of work that contractors can bid from without guessing.

Context you provide

  • {{property_address_or_unit}} — where the work happens
  • {{property_type_and_size}} — e.g. 3 bed single family, 1,400 sq ft
  • {{renovation_goal}} — rental turn, flip, cosmetic refresh, full gut
  • {{rooms_or_systems_in_scope}} — kitchen, baths, roof, HVAC, and so on
  • {{known_conditions_and_defects}} — from your inspection notes
  • {{work_you_want_done}} — your rough task list
  • {{materials_and_finish_preferences}} — grade, and who supplies
  • {{budget_range}} — total or per trade
  • {{target_timeline}} — start and completion dates
  • {{bid_format_and_deadline}} — how and when contractors should respond
  • {{site_access_and_occupancy}} — vacant or occupied, keys, utilities
  • {{permit_and_hoa_notes}} — anything you already know

Instructions

  1. Ask for any missing inputs, then draft the scope.
  2. Group the work by area and trade so each contractor sees only the items relevant to them.
  3. State what is included and what is excluded on each line.
  4. Name who supplies materials, who removes debris, and who protects existing finishes.
  5. Note site access, working hours, utility status, and occupancy limits.
  6. Flag every item that needs a measurement, permit, or professional verification.
  7. Close with bid submission requirements and a clear response deadline.

Output format Markdown with these headings: Project Summary, Scope by Area and Trade, Included, Excluded, Materials and Responsibility, Site Conditions and Access, Schedule, Bid Submission, Open Items. Use bullets and plain language, one to two pages. Leave out pricing you have not set, warranties, and legal clauses.

Guardrails

  • Do not invent measurements, material specs, code requirements, permit rules, or product names. Mark unknowns as "to be confirmed."
  • Flag assumptions, and tell the user when a licensed structural, electrical, plumbing, or roofing professional plus local permit or HOA approval is required before work starts.
  • Keep the wording neutral so competing bids stay comparable.

Example {{property_address_or_unit}}: 412 Oak St Unit B; {{renovation_goal}}: rental turn; {{work_you_want_done}}: new flooring, interior paint, replace two vanities.