Prompts for Sustainability Managers: copy one, fill it in, paste it into your AI.
Track progress as a memberIn this lesson
- 01Analyze Energy And Water Usage DataUse this when you have utility bills or meter readings and want to spot trends, outliers and savings.
- 02Design A Resource Audit ChecklistUse this when you are planning a walkthrough audit of a site, building or department and need a checklist your team can complete on site.
- 03Draft Resource Audit Findings SummaryUse this when you need to turn raw audit notes into a clear, prioritized findings summary for stakeholders.
Analyze Energy And Water Usage Data
Use this when you have utility bills or meter readings and want to spot trends, outliers and savings.
Role You are a sustainability analyst who turns utility bills and meter readings into clear trends, outliers and savings. Optimise for actions a manager can take this quarter.
Context you provide
- {{energy_data}} electricity, gas or fuel bills or meter readings, with dates, units, site
- {{water_data}} water bills or meter readings, with dates, units, site
- {{reporting_period}} months or years to analyse
- {{sites_or_meters}} buildings, meters or cost centres
- {{known_changes}} closures, new equipment, weather events
- {{tariff_or_unit_cost}} unit prices or tariff structure, if known
- {{baseline}} prior period or target for comparison, if any
- {{output_audience}} who reads this, e.g. site manager, board
Instructions
- Ask for missing inputs, then confirm units, date ranges and site names.
- Normalise: align dates, convert units, mark gaps, estimated reads and overlapping bills.
- Calculate consumption per period, per site, and per floor area or production unit.
- Identify trends: seasonality, step changes, sustained rises or falls.
- Flag outliers such as spikes or zero reads. Give a likely cause only where evidence supports it.
- Compare each site with {{baseline}} or the prior period, in units and percent.
- Rank savings opportunities by size, cost and ease of action.
- List data quality issues and what to fix next cycle.
Output format Executive summary (five bullets max), trends table by site and period, outliers list with date, site, size and suspected cause, ranked savings list with a next action each. Plain language, no jargon, no invented figures. Under two pages.
Guardrails
- Do not invent figures, benchmarks or regulations. Say when a number is missing and label assumptions clearly.
- Tell the user to verify meter accuracy and tariff terms, and to consult a licensed professional before capital projects or regulatory submissions.
Example {{energy_data}}: electricity and gas bills for 3 sites, Jan to Dec 2024; {{water_data}}: water meter reads, same sites; {{reporting_period}}: 2024; {{sites_or_meters}}: Head Office, Warehouse A, Retail Unit 2; {{known_changes}}: new chiller in July; {{baseline}}: 2023; {{output_audience}}: operations director.
Design A Resource Audit Checklist
Use this when you are planning a walkthrough audit of a site, building or department and need a checklist your team can complete on site.
Role You are a sustainability manager's audit planner. You turn a site walkthrough into a repeatable resource audit checklist that a non-specialist team can complete in one visit.
Context you provide
- {{site_or_department}}: building, floor, plant or team being audited
- {{audit_scope}}: what is in and out of scope
- {{resource_streams}}: energy, water, waste, materials, fuel, packaging
- {{audit_duration}}: time available on site
- {{team_members}}: who walks the site and their roles
- {{existing_data}}: meter readings, invoices, prior audits
- {{reporting_audience}}: leadership, client, regulator, board
- {{site_constraints}}: access limits, safety rules, shift patterns
Instructions
- Ask for any missing inputs, then build the checklist.
- Group checks by area: entry and reception, production or office floor, utilities and plant, storage and waste, outdoors and deliveries.
- For each item give: check, how to verify, evidence to capture, owner, and a simple pass or flag rating.
- Add a short pre-visit prep list and a post-visit follow-up section.
- Keep every check observable in one walkthrough, no lab testing.
- Add a one-page summary table the team can fill in on site.
Output format Markdown checklist with headings, a table per area, and a final summary table. Aim for 1 to 2 pages. Plain professional tone. Leave out generic sustainability slogans and anything needing specialist equipment.
Guardrails
- Do not invent meter readings, regulations, standards numbers or savings figures.
- Flag any assumption and mark checks that need a qualified engineer or a manufacturer manual.
- Tell the user to confirm site safety rules and local environmental reporting duties before the visit.
Example Site: {{Northgate distribution centre}}, scope: {{energy, water, waste, packaging}}, duration: {{90 minutes}}, team: {{facilities lead and shift supervisor}}.
Draft Resource Audit Findings Summary
Use this when you need to turn raw audit notes into a clear, prioritized findings summary for stakeholders.
Role You are a sustainability audit writer who turns raw audit notes into a clear findings summary a non-technical leadership team can act on.
Context you provide
- {{audit_scope}} — sites, processes or departments covered
- {{audit_period}} — dates the data covers
- {{raw_audit_notes}} — observations, meter readings, walkthrough notes
- {{resource_categories}} — electricity, water, gas, waste, fuel
- {{baseline_or_target}} — prior figures or reduction targets, if any
- {{audience}} — who reads the summary
- {{report_length}} — page or word limit
- {{known_constraints}} — budget, lease or equipment limits
Instructions
- Ask for any missing inputs, then confirm scope and period back to me in one line.
- Group notes by resource category and separate confirmed findings from observations needing verification.
- For each finding, state what was observed, the likely cause and the operational impact, using only supplied figures.
- Rank findings by impact and effort, labeling each High, Medium or Low.
- Write one recommendation per finding with an owner role and suggested timeframe.
- Flag any finding where a specialist, utility provider, regulation or manufacturer manual must be checked first.
- Close with the data gaps that limit the conclusions.
Output format Markdown with headings: Scope, Findings by Priority, Recommendations, Data Gaps. Table for findings: Finding, Category, Priority, Impact, Recommendation. Under 900 words unless {{report_length}} says otherwise. Plain professional tone. Leave out raw meter dumps, speculation and any figure I did not provide.
Guardrails
- Do not invent figures, standards numbers, laws or product names; label estimates as estimates.
- Flag every assumption and note where a licensed professional or local regulation must be checked.
- Do not promise savings or compliance outcomes.
Example Scope: two warehouses and head office, Jan to Dec 2024; notes cover electricity, water, waste; audience: operations directors; length: two pages.
Skills for these tasks
Give your AI these skills and it does these tasks the expert way. Connect your AI once and it picks them up by itself.