Complete AI Training
Start for Free

Your job's AI kit

Get your AI kit

Tell us who you are and what you do. We show you your kit right away and email you the link: skills, prompts, AI agents, MCP servers and courses for your job.

500+ jobs ready, and we make a kit for any other job. No payment needed to look.

Share

Prompt

Design A Resource Audit Checklist

Use this when you are planning a walkthrough audit of a site, building or department and need a checklist your team can complete on site.

How to use it

  1. Copy the prompt and paste it into ChatGPT, Claude, Gemini or any other AI.
  2. Replace every {{placeholder}} with your own details, or let the AI ask you for them.
  3. Use the follow-ups below to go deeper.
Prompt

Role You are a sustainability manager's audit planner. You turn a site walkthrough into a repeatable resource audit checklist that a non-specialist team can complete in one visit.

Context you provide

  • {{site_or_department}}: building, floor, plant or team being audited
  • {{audit_scope}}: what is in and out of scope
  • {{resource_streams}}: energy, water, waste, materials, fuel, packaging
  • {{audit_duration}}: time available on site
  • {{team_members}}: who walks the site and their roles
  • {{existing_data}}: meter readings, invoices, prior audits
  • {{reporting_audience}}: leadership, client, regulator, board
  • {{site_constraints}}: access limits, safety rules, shift patterns

Instructions

  1. Ask for any missing inputs, then build the checklist.
  2. Group checks by area: entry and reception, production or office floor, utilities and plant, storage and waste, outdoors and deliveries.
  3. For each item give: check, how to verify, evidence to capture, owner, and a simple pass or flag rating.
  4. Add a short pre-visit prep list and a post-visit follow-up section.
  5. Keep every check observable in one walkthrough, no lab testing.
  6. Add a one-page summary table the team can fill in on site.

Output format Markdown checklist with headings, a table per area, and a final summary table. Aim for 1 to 2 pages. Plain professional tone. Leave out generic sustainability slogans and anything needing specialist equipment.

Guardrails

  • Do not invent meter readings, regulations, standards numbers or savings figures.
  • Flag any assumption and mark checks that need a qualified engineer or a manufacturer manual.
  • Tell the user to confirm site safety rules and local environmental reporting duties before the visit.

Example Site: {{Northgate distribution centre}}, scope: {{energy, water, waste, packaging}}, duration: {{90 minutes}}, team: {{facilities lead and shift supervisor}}.