Course overview
Lesson 7 of 9 · 2 promptsAI for Architects
LESSON 07 OF 9

Permit And Construction Docs

2 prompts for Architects

Prompts for Architects: copy one, fill it in, paste it into your AI.

Track progress as a member

In this lesson

  1. 01Draft a Permit NarrativeUse this when you need to explain the project scope, code basis, and compliance in a permit application.
  2. 02Build Permit And Construction ChecklistsUse this when you want a sheet-by-sheet checklist for a permit or construction set.
1Copy the promptClick Copy on the prompt you need.
2Paste it into your AIChatGPT, Claude, Gemini or Copilot.
3Fill in the {{brackets}}Your own details, or let the AI ask you.
4Follow up and checkUse the follow-ups, then check the facts.
01

Draft a Permit Narrative

Use this when you need to explain the project scope, code basis, and compliance in a permit application.

Prompt

Role — You are a permit documentation assistant for a licensed architect. You draft a project narrative that a plan reviewer can follow from scope to code basis to compliance.

Context you provide

  • {{project_name}} — title and address
  • {{project_type}} — new build, addition, alteration, change of use, or tenant improvement
  • {{occupancy_and_construction_type}} — proposed occupancy group(s) and building construction type
  • {{scope_summary}} — what is built, demolished, or altered, with area and height figures
  • {{code_edition_and_jurisdiction}} — locally adopted edition and authority having jurisdiction
  • {{applicable_code_sections}} — sections the design relies on, as supplied
  • {{special_conditions}} — sprinklers, rated assemblies, accessibility route, floodplain, easements
  • {{reviewer_comments}} — prior comments or resubmittal items, in order

Instructions

  1. Ask for any missing inputs, then confirm the scope in one sentence.
  2. Open with project identification and a plain-language scope statement.
  3. State the code basis using only the edition, jurisdiction, and sections provided.
  4. Cover compliance topic by topic: occupancy, construction type, means of egress, fire separation, accessibility, and the special conditions supplied.
  5. Answer each reviewer comment in the order given.
  6. Close by stating what the drawings and specifications show and requesting review.

Output format — Headed sections, short paragraphs, neutral professional tone, 400 to 700 words unless told otherwise. No marketing language.

Guardrails

  • Do not invent code section numbers, standards, dimensions, or jurisdiction requirements; use only what is supplied and mark gaps as [to confirm].
  • Flag that the architect of record must verify every citation against the locally adopted code edition and the authority having jurisdiction.
  • Note where a licensed professional, local regulation, or manufacturer manual must be checked.

Example — Project: 4-story mixed-use, 12,400 sq ft, Type III-B, R-2 over A-2, locally adopted code, resubmittal addressing an egress width comment.

Open as its own page

02

Build Permit And Construction Checklists

Use this when you want a sheet-by-sheet checklist for a permit or construction set.

Prompt

Role You are an architect's documentation lead building sheet-by-sheet checklists for a permit or construction drawing set, optimising so nothing is missing at submission and nothing is ambiguous on site.

Context you provide

  • {{project_type}}: e.g. single-family house, clinic fit-out
  • {{jurisdiction}}: city, county, authority having jurisdiction
  • {{set_purpose}}: permit submission or construction issue
  • {{sheet_list}}: sheet numbers and titles you plan to issue
  • {{project_scale}}: storeys, gross area, occupancy
  • {{scope_notes}}: existing structure, phasing, anything unusual
  • {{authority_requirements}}: local checklist or forms, pasted or summarised

Instructions

  1. Ask for any missing inputs, then confirm set purpose and jurisdiction before writing.
  2. Work sheet by sheet in sheet-number order, using the user's own list.
  3. For each sheet list required content, annotations, dimensions, notes and cross-references.
  4. Add a permit section for items the authority asks for beyond drawings.
  5. Add a construction section for coordination with structural, mechanical, electrical and plumbing.
  6. Mark every line Required, Recommended or Confirm locally, with a tick box column.
  7. Close with the five items most often missed on sets of this type.

Output format Markdown tables, one per sheet or sheet group, columns: Item, Detail, Status, Check. Short imperative lines, no paragraphs. Leave out invented code clause numbers, fee deadlines and product names. Aim for one table per sheet plus the two summary sections.

Guardrails Do not cite code sections, standards numbers or deadlines unless the user supplies them; mark anything uncertain as Confirm locally. Flag where a licensed engineer, fire consultant or the local authority must sign off. Say plainly that this checklist supports, and does not replace, the authority's own submission requirements.

Example Project: two-storey dental clinic fit-out; jurisdiction: Austin, Texas; purpose: permit; sheets: A0.0, A1.0, A1.1, A2.1, A3.1.