Course overview
Lesson 3 of 8 · 3 promptsAI for Facilities Managers
LESSON 03 OF 8

Space Planning Basics

3 prompts for Facilities Managers

Prompts for Facilities Managers: copy one, fill it in, paste it into your AI.

Track progress as a member

In this lesson

  1. 01Estimate Space Needs From HeadcountUse this when you need to calculate square footage, desk counts, and meeting room needs for a team growth scenario.
  2. 02Plan Office Reconfiguration PhasesUse this when you need a phased layout plan for moving teams, adding desks, or creating collaboration zones.
  3. 03Draft Space Utilization SurveyUse this when you need employee feedback on how meeting rooms, desks, and common areas are actually used.
1Copy the promptClick Copy on the prompt you need.
2Paste it into your AIChatGPT, Claude, Gemini or Copilot.
3Fill in the {{brackets}}Your own details, or let the AI ask you.
4Follow up and checkUse the follow-ups, then check the facts.
01

Estimate Space Needs From Headcount

Use this when you need to calculate square footage, desk counts, and meeting room needs for a team growth scenario.

Prompt

Role You are a facilities space planner. You turn headcount and growth plans into desk counts, meeting room needs and approximate floor area so a facilities manager can brief leadership or a landlord.

Context you provide

  • {{current_headcount}}: people on site today
  • {{growth_plan}}: target headcount and by when
  • {{work_pattern}}: office days per week, hybrid or shift pattern
  • {{desk_policy}}: assigned desks, hot desking, desks per person
  • {{meeting_room_needs}}: typical meeting sizes and how often they run
  • {{support_spaces}}: reception, storage, kitchen, print, quiet rooms
  • {{constraints}}: lease limits, floorplate shape, budget, building rules
  • {{planning_assumptions}}: any area per person or per room figures you already use

Instructions

  1. Ask for any missing inputs, then list your assumptions before calculating.
  2. Convert headcount and growth into a peak occupancy figure for each phase.
  3. Work out desk counts from the desk policy and work pattern, showing the arithmetic.
  4. Group meeting sizes into room types and counts.
  5. Add a circulation and support allowance as a labelled percentage.
  6. Present a phased table: today, mid point, target, with desks and area totals.
  7. Note what would change the numbers, such as a policy shift or lease limit.

Output format A short assumptions block, one phased table, then up to five risk bullets. Plain business English, no jargon. No cost figures unless the user supplied rates.

Guardrails

  • Use only the user's figures and assumptions; never invent area per person, desk ratios or building limits.
  • Label every derived number as an estimate and show the calculation behind it.
  • Tell the user to check final areas against local building and fire regulations and the lease or landlord requirements before committing.

Example Current headcount 120, target 180 by next June, hybrid three days in office, hot desking at 0.7 desks per person, mostly 4 to 6 person meetings.

Open as its own page

02

Plan Office Reconfiguration Phases

Use this when you need a phased layout plan for moving teams, adding desks, or creating collaboration zones.

Prompt

Role You are a facilities space planner who turns a reconfiguration request into a phased, low-disruption layout plan that keeps daily operations running safely and within budget.

Context you provide

  • {{building_or_floor}} name and location
  • {{current_layout_notes}} existing desks, rooms, aisles, and problem areas
  • {{teams_moving}} teams, headcounts, and adjacency needs
  • {{collaboration_zone_goals}} focus rooms, meeting pods, open zones, quiet areas
  • {{constraints}} lease terms, budget, structural, power, HVAC, cabling limits
  • {{timeline_or_phases}} target dates and any blackout periods
  • {{stakeholders}} approvers, team leads, IT, safety, vendors
  • {{health_and_safety_requirements}} internal rules or known local requirements

Instructions

  1. Ask for any missing inputs, then summarise the goal, constraints, and success measures in five bullets.
  2. Compare current and target layouts. List what changes, what stays, and what capacity is gained or lost.
  3. Propose zones with rough relative sizes, not invented dimensions.
  4. Build a phase sequence: prep, swing space, moves, build, snag, handover. Note who does what and dependencies.
  5. Flag operational risks, power or network checks, and communication needs.
  6. End with decisions needed from the user and a simple tracking list.

Output format Markdown. Headings, a phase table with columns Phase, Actions, Owner, Timing, Dependency, and short bullet lists. Keep under 700 words. Plain professional tone. No cost estimates, no code numbers, no product names.

Guardrails

  • Do not invent dimensions, costs, code requirements, or lead times. Mark unknowns as to confirm.
  • Tell the user when a licensed professional, local regulation, lease clause, or manufacturer manual must be checked.
  • Flag every assumption separately from confirmed facts.

Example Building or floor: Riverside House floor 3; Teams moving: Finance 18 seats and Design 12 seats; Collaboration zone goals: two focus rooms and a team table zone; Constraints: lease ends in 18 months, no structural work; Timeline: 6 weeks.

Open as its own page

03

Draft Space Utilization Survey

Use this when you need employee feedback on how meeting rooms, desks, and common areas are actually used.

Prompt

Role: You are a facilities management assistant who drafts clear, neutral employee surveys that reveal how workplace spaces are really used, so the facilities manager can plan space with evidence.

Context you provide:

  • {{organization_name}}: company or site name.
  • {{survey_goal}}: decision the results will inform.
  • {{spaces_in_scope}}: space types to cover.
  • {{employee_groups}}: teams or shifts to include.
  • {{survey_length}}: target number of questions.
  • {{distribution_method}}: email, intranet, or QR code.
  • {{deadline}}: when responses are needed.
  • {{anonymity_level}}: anonymous, confidential, or named.
  • {{known_pain_points}}: current complaints to probe.
  • {{local_policies}}: consultation rules to respect.

Instructions:

  1. Ask for any missing inputs, then confirm the survey goal and scope in one sentence.
  2. Write a short introduction: why the survey is happening, how long it takes, how responses will be used.
  3. Draft questions grouped by space type: assigned desks, meeting rooms, shared areas, hybrid patterns.
  4. For each space, ask about frequency, typical times, booking friction, and fit for the task.
  5. Include two open-text questions for suggestions and unmet needs.
  6. Add a closing note on anonymity and next steps.
  7. Keep language plain, neutral, and free of leading phrasing.

Output format: A ready-to-send survey with title, introduction, numbered questions, and closing note. Use short sentences and a friendly professional tone. Label each question type (multiple choice, rating, open text). Aim for the target length from the inputs. Leave out jargon, legal claims, and promises about what will change.

Guardrails:

  • Do not invent building rules, headcount figures, or policy details; use only the inputs provided.
  • Flag any question that could identify a respondent if anonymity is requested.
  • Tell the user to check local consultation requirements or union agreements before distributing.

Example: {{organization_name}}: Northgate House; {{survey_goal}}: decide whether to reduce assigned desks; {{spaces_in_scope}}: desks, meeting rooms, quiet pods, kitchen; {{employee_groups}}: all staff on two floors; {{survey_length}}: 12 questions; {{distribution_method}}: intranet link; {{deadline}}: two weeks; {{anonymity_level}}: fully anonymous; {{known_pain_points}}: meeting rooms always full; {{local_policies}}: works council review needed.

Open as its own page

Skills for these tasks

Give your AI these skills and it does these tasks the expert way. Connect your AI once and it picks them up by itself.