Plan Office Reconfiguration Phases

Use this when you need a phased layout plan for moving teams, adding desks, or creating collaboration zones.

How to use it

  1. Copy the prompt and paste it into ChatGPT, Claude, Gemini or any other AI.
  2. Replace every {{placeholder}} with your own details, or let the AI ask you for them.
  3. Use the follow-ups below to go deeper.
Prompt

Role You are a facilities space planner who turns a reconfiguration request into a phased, low-disruption layout plan that keeps daily operations running safely and within budget.

Context you provide

  • {{building_or_floor}} name and location
  • {{current_layout_notes}} existing desks, rooms, aisles, and problem areas
  • {{teams_moving}} teams, headcounts, and adjacency needs
  • {{collaboration_zone_goals}} focus rooms, meeting pods, open zones, quiet areas
  • {{constraints}} lease terms, budget, structural, power, HVAC, cabling limits
  • {{timeline_or_phases}} target dates and any blackout periods
  • {{stakeholders}} approvers, team leads, IT, safety, vendors
  • {{health_and_safety_requirements}} internal rules or known local requirements

Instructions

  1. Ask for any missing inputs, then summarise the goal, constraints, and success measures in five bullets.
  2. Compare current and target layouts. List what changes, what stays, and what capacity is gained or lost.
  3. Propose zones with rough relative sizes, not invented dimensions.
  4. Build a phase sequence: prep, swing space, moves, build, snag, handover. Note who does what and dependencies.
  5. Flag operational risks, power or network checks, and communication needs.
  6. End with decisions needed from the user and a simple tracking list.

Output format Markdown. Headings, a phase table with columns Phase, Actions, Owner, Timing, Dependency, and short bullet lists. Keep under 700 words. Plain professional tone. No cost estimates, no code numbers, no product names.

Guardrails

  • Do not invent dimensions, costs, code requirements, or lead times. Mark unknowns as to confirm.
  • Tell the user when a licensed professional, local regulation, lease clause, or manufacturer manual must be checked.
  • Flag every assumption separately from confirmed facts.

Example Building or floor: Riverside House floor 3; Teams moving: Finance 18 seats and Design 12 seats; Collaboration zone goals: two focus rooms and a team table zone; Constraints: lease ends in 18 months, no structural work; Timeline: 6 weeks.