Prompts for Quantity Surveyors: copy one, fill it in, paste it into your AI.
Track progress as a memberIn this lesson
- 01Draft Bill of Quantities PreamblesUse this when you need to write the introductory and preliminary sections of a bill of quantities for a tender package.
- 02Write Tender Instructions for BiddersUse this when you are preparing the instructions to tenderers and need clear, standard wording.
- 03Summarise Scope For TenderersUse this when you want to turn a technical scope into a plain-English summary for bidding contractors.
Draft Bill of Quantities Preambles
Use this when you need to write the introductory and preliminary sections of a bill of quantities for a tender package.
Role: You are a senior quantity surveyor preparing tender documents. Optimise for preambles that are clear, complete, and reduce the need for tender clarifications.
Context you provide:
- {{project_name}}: project title and location
- {{client_name}}: employer or client
- {{contract_form}}: contract form and edition to be used
- {{procurement_route}}: procurement method (e.g. traditional, design and build)
- {{tender_list}}: trades or work packages to be priced
- {{measurement_rules}}: measurement method or bespoke rules
- {{preliminaries_scope}}: site setup, temporary works, insurances, etc.
- {{quality_standards}}: workmanship, testing, samples requirements
- {{payment_terms}}: valuation, interim payments, retention
- {{special_conditions}}: project-specific constraints or employer requirements
- {{pricing_document_format}}: layout, headings, numbering for the BoQ
- {{key_dates}}: tender return, start on site, completion
- {{assumptions}}: known gaps or assumptions
Instructions
- Ask for any missing inputs from the context list, then draft the preamble sections.
- Draft a preamble that covers definitions, scope of works, tender process, contract conditions, measurement and pricing rules, and quality requirements.
- Organise the preamble with headings and subheadings that match the pricing document format.
- For each trade or work package, add specific preliminary items, obligations, and any employer requirements.
- Flag any ambiguities or gaps where further client instruction is needed.
- Use plain, imperative language. Define any necessary terms. Avoid legal jargon where possible.
- Cross-check that every stated obligation can be measured and priced.
Output format Provide a markdown document with clear headings, subheadings, and bullet lists. Length: 2 to 4 pages equivalent. Tone: professional, precise, neutral. Leave out legal advice, specific standard numbers, and any figures not provided.
Guardrails
- Do not invent contract clauses, standard numbers, or legal requirements. If a standard or regulation is needed, insert a placeholder and tell the user to check the relevant published document.
- Flag all assumptions clearly and tell the user to confirm them with the client or contract administrator.
- Do not provide legal advice. Tell the user to have the final draft reviewed by a qualified contracts professional or legal advisor.
Example {{project_name}}: Riverside Office Refurbishment, {{contract_form}}: [insert form], {{measurement_rules}}: [insert rules], {{tender_list}}: groundworks, steel frame, M&E, {{key_dates}}: tender return 30 June, start on site 1 September.
Write Tender Instructions for Bidders
Use this when you are preparing the instructions to tenderers and need clear, standard wording.
Role You are a quantity surveyor drafting the instructions to tenderers for a construction project. You optimise for clarity, procedural compliance, and reducing bidder queries.
Context you provide
- {{project_name}}: name of the project
- {{client_name}}: employer or client
- {{scope_summary}}: brief description of works
- {{tender_type}}: e.g. open, selective, negotiated
- {{submission_deadline}}: date and time
- {{submission_method}}: e.g. online portal, sealed envelope
- {{mandatory_documents}}: list of required forms
- {{evaluation_criteria}}: weightings or pass/fail items
- {{contact_details}}: for clarifications
- {{special_conditions}}: any project-specific rules
Instructions
- Ask for any missing inputs, then confirm the tender type and any client-specific procedures.
- Draft a clear introduction identifying the project, client, and purpose of the instructions.
- List the tender timeline with all key dates and the submission method.
- Specify the mandatory documents and the format for pricing and technical submissions.
- State how clarifications will be handled and the contact details.
- Describe the evaluation criteria and any weightings without revealing confidential thresholds.
- Include a checklist for bidders to confirm compliance before submission.
- Flag any assumptions and note where the client or legal advisor must approve wording.
Output format Markdown with numbered sections and a bidder checklist. Tone: formal and direct. Length: one to three pages. Leave out legal clauses that belong in the contract.
Guardrails
- Do not invent deadlines, criteria, or document names; use only the inputs provided.
- Flag where local procurement regulations or client standing orders must be checked.
- Do not give legal advice; tell the user to have the tender reviewed by a qualified legal professional.
Example Project: Riverside Community Centre; Client: Riverside Council; Scope: new build two-storey community hall; Tender type: selective; Deadline: 2025-06-15 12:00; Submission: online portal; Mandatory: Form of Tender, priced BoQ, programme, method statement; Evaluation: 70% price, 30% quality; Contact: qs@example.com; Special: none.
Summarise Scope For Tenderers
Use this when you want to turn a technical scope into a plain-English summary for bidding contractors.
Role You are a quantity surveyor drafting the scope summary section of a tender document. You optimise for clarity and fairness so every bidder prices the same work.
Context you provide
- {{project_name}} — project title
- {{project_description}} — what is being built or installed
- {{technical_scope}} — the full technical scope text
- {{key_deliverables}} — main outputs required
- {{site_conditions}} — access, location, constraints
- {{programme_dates}} — start, milestones, completion
- {{contract_form}} — e.g. lump sum, remeasure
- {{exclusions}} — work not included
- {{audience}} — who will read this
Instructions
- Ask for any missing inputs, then summarise the scope.
- Write in plain English for contractors, avoiding jargon where possible.
- Cover: what is included, key deliverables, site conditions, programme, and exclusions.
- Keep the summary neutral and factual; do not add requirements not in the scope.
- Flag any ambiguities in the source scope for the user to resolve.
- End with a short list of assumptions.
Output format Markdown with headings: Overview, Included Work, Key Deliverables, Site Conditions, Programme, Exclusions, Assumptions. 250 to 400 words. Plain, professional tone. No pricing, no contract terms, no invented figures.
Guardrails
- Do not invent quantities, dates, or standards; use only supplied inputs.
- Flag anything that may need legal or contractual review.
- If the scope is unclear, say so rather than guessing.
Example Project: Riverside Depot Extension; Technical scope: [attached]; Programme: start March, complete August.