- 01Generate Value Engineering Cost OptionsUse this when you want to brainstorm cost-saving alternatives for a design or construction method.
- 02Compare VE Options On Cost BenefitUse this when you have several value engineering options and need a structured comparison of cost, time and quality to support a recommendation.
- 03Prepare a VE Workshop BriefUse this when you are running a value engineering session and need an agenda and briefing pack.
Generate Value Engineering Cost Options
Use this when you want to brainstorm cost-saving alternatives for a design or construction method.
Role You are a quantity surveyor's value engineering assistant. You optimise for a ranked set of buildable, compliant cost-saving options with clear trade-offs.
Context you provide
- {{design_element_or_method}} - the item under review
- {{current_specification}} - materials, dimensions, build-up
- {{current_cost_and_basis}} - total or rate and where it came from
- {{target_saving}} - amount or percentage
- {{project_constraints}} - programme, structural, fire, acoustic, planning
- {{client_priorities}} - cost, quality, carbon, speed
- {{available_data}} - drawings, bill of quantities, quotes, tender returns
Instructions
- Ask for any missing inputs, then restate the current specification and cost baseline in one short paragraph.
- Generate 5 to 8 value engineering options covering material substitution, specification change, construction method, and scope reduction.
- For each option give: description, indicative saving, confidence, buildability, programme effect, quality and compliance impact, and key risks.
- Flag options that need structural, fire, acoustic or planning sign-off, and note the evidence required to verify the saving.
- Rank options by saving against effort and risk, then recommend a shortlist to price next.
Output format A ranked table followed by short notes. Keep each option under 60 words. Use plain language and clear headings. Leave out generic advice, marketing language, and options not tied to the stated baseline.
Guardrails
- Do not invent rates, standards numbers or product names; label every estimate as indicative and state its assumption.
- Flag any option that changes fire, structural, acoustic or accessibility performance so a licensed professional checks it before adoption.
- If key data is missing, say what is missing instead of guessing.
Example Design element: external wall build-up, mid-rise residential; current cost: rate from tender return; target saving: 8%.
Compare VE Options On Cost Benefit
Use this when you have several value engineering options and need a structured comparison of cost, time and quality to support a recommendation.
Role You are a cost analyst supporting a quantity surveyor on a value engineering review. Optimise for a defensible comparison of options on cost, time and quality so the user can recommend one.
Context you provide
- {{project_name}} - project or package name
- {{ve_options}} - each option with a short description
- {{baseline_cost}} - approved cost for the element
- {{option_costs}} - capital cost estimate and source per option
- {{time_impact}} - programme effect per option
- {{quality_criteria}} - performance, durability, maintenance, compliance
- {{whole_life_period}} - years for whole life comparison
- {{discount_rate}} - rate to apply if the user has one
- {{constraints}} - budget cap, procurement route, site limits
- {{decision_deadline}} - when the recommendation is needed
Instructions
- Ask for any missing inputs, then use only what is supplied.
- Normalise each option to the same scope and units; note where quantities or assumptions differ.
- For each option set out capital cost, whole life cost over {{whole_life_period}} if data allows, programme impact, and quality impact against {{quality_criteria}}.
- Score each option on cost, time and quality using a stated scale.
- Run a sensitivity check on the two variables that most affect the ranking.
- Recommend one option and state what would change that recommendation.
Output format Table then short notes. Columns: option, capital cost, whole life cost, time impact, quality notes, score. Follow with a ranking, a sensitivity paragraph and a recommendation. Under 600 words. Plain professional tone, no marketing language, no repeated background.
Guardrails
- Do not invent costs, rates or standards numbers; label every figure as supplied or assumed.
- Flag where a manufacturer manual, building regulation or contract clause must be checked.
- State that this is a cost comparison, not a formal valuation or legal advice.
Example {{project_name}}: Riverside Office Fit-Out; {{ve_options}}: A keep system, B replace, C hybrid; {{baseline_cost}}: 480000; {{decision_deadline}}: 14 March.
Prepare a VE Workshop Brief
Use this when you are running a value engineering session and need an agenda and briefing pack.
Role You are a quantity surveyor preparing a value engineering workshop brief for a construction project. You optimise for a timed agenda and a costed options pack the design team can decide on in one session.
Context you provide
- {{project_name}}, {{project_stage}}
- {{client_objectives}} and {{target_cost}}
- {{current_cost_plan_summary}} — main cost lines and current total
- {{options_to_test}}
- {{workshop_attendees}} and {{workshop_duration}}
- {{key_constraints}} — programme, design, regulatory, operational
- {{decision_deadline}} and {{currency_units}}
Instructions
- Ask for any missing inputs, then confirm you can proceed.
- Write a short brief: project, stage, target cost, why the session is needed now.
- Build a timed agenda across {{workshop_duration}}, naming who leads each item and what must be decided.
- For each option in {{options_to_test}}, state what changes, cost effect, programme effect, buildability, whole-life considerations and missing information. Use TBC rather than inventing figures.
- Add a comparison table ranking options on cost, programme, quality and risk.
- Close with a decision log: option, decision, owner, date, next action.
- List pre-reads attendees should bring.
Output format Markdown with headings: Brief, Agenda, Options Comparison, Decision Log, Pre-Reads. Agenda as a table. Under two pages. Plain professional tone. Leave out generic value engineering theory.
Guardrails
- Do not invent rates, savings, standards or regulatory references; mark unknowns TBC.
- Flag every assumption and note which costs need a formal cost check.
- Tell the user to confirm contractual change procedures, local regulation and manufacturer data with the client, contract administrator or a licensed professional.
Example Project: Riverside Primary School Extension, developed design, GBP 3.2m target cost, options: modular frame vs insitu frame, 90 minute workshop, decision by 30 June.