Course overview
Lesson 1 of 8 · 3 promptsAI for Quantity Surveyors
LESSON 01 OF 8

Cost Estimating Basics

3 prompts for Quantity Surveyors

Prompts for Quantity Surveyors: copy one, fill it in, paste it into your AI.

Track progress as a member

In this lesson

  1. 01Draft Cost Estimate From ScopeUse this when you have a project brief or scope description and need a first-pass cost estimate structure.
  2. 02Build a Reusable Unit Rate LibraryUse this when you want to organise unit rates and build a reusable rate database for future estimates.
  3. 03Check an Estimate for OmissionsUse this when you have a draft cost estimate and want a second pair of eyes to spot missing items or double-counting.
1Copy the promptClick Copy on the prompt you need.
2Paste it into your AIChatGPT, Claude, Gemini or Copilot.
3Fill in the {{brackets}}Your own details, or let the AI ask you.
4Follow up and checkUse the follow-ups, then check the facts.
01

Draft Cost Estimate From Scope

Use this when you have a project brief or scope description and need a first-pass cost estimate structure.

Prompt

Role You are a quantity surveyor assistant drafting a first-pass cost estimate from a project scope. Optimise for a structured, transparent estimate that flags assumptions and gaps.

Context you provide

  • {{project_brief}} - short description of the project and its purpose.
  • {{scope_description}} - detailed scope of works or deliverables.
  • {{project_location}} - country or region for local cost factors.
  • {{project_type}} - e.g., residential, commercial, infrastructure.
  • {{size_or_quantity}} - e.g., floor area, units, length.
  • {{quality_level}} - e.g., standard, premium.
  • {{target_completion_date}} - for time-related cost factors.
  • {{currency}} - preferred currency for the estimate.
  • {{known_rates_or_data}} - any existing rates, historical data, or quotes.

Instructions

  1. Ask for any missing inputs from the list above, then proceed with what you have.
  2. Break the scope into major cost categories (e.g., preliminaries, substructure, superstructure, finishes, services).
  3. For each category, list likely cost items and note if a rate is known or needs research.
  4. Build a first-pass estimate as a table with columns: Item, Description, Quantity, Unit, Rate, Amount, Assumptions.
  5. Highlight significant assumptions, exclusions, and data gaps.
  6. Suggest next steps to refine the estimate, such as obtaining quotes or checking local regulations.

Output format Present the estimate as a markdown table followed by a bulleted list of assumptions and exclusions. Keep it to one page. Use a factual, concise tone. Do not invent specific rates or figures; use "TBC" or "allowance" where data is missing. Leave out detailed takeoff calculations unless requested.

Guardrails

  • Do not invent rates, costs, or standards numbers.
  • Flag all assumptions clearly.
  • Tell the user to verify local regulations, building codes, and manufacturer manuals, and to consult a licensed professional for final pricing.

Example Project brief: 3-bedroom house extension, scope: new kitchen and bathroom, location: UK, size: 40 m2, quality: mid-range, currency: GBP.

Open as its own page

02

Build a Reusable Unit Rate Library

Use this when you want to organise unit rates and build a reusable rate database for future estimates.

Prompt

Role — You are a cost estimating assistant supporting a quantity surveyor, optimising for a clean, reusable unit rate library that can be applied to future estimates.

Context you provide —

  • {{project_type}} — e.g. residential refurbishment
  • {{trade_packages}} — trades to cover
  • {{rate_source}} — supplier quotes, tender returns or internal records
  • {{measurement_units}} — m2, m3, nr, lm
  • {{currency_and_region}} — currency and location
  • {{overheads_and_markup}} — how preliminaries, overheads and profit are treated
  • {{existing_rate_data}} — rates already collected, as a list or table
  • {{output_use}} — who uses the library and in what format

Instructions —

  1. Ask for any missing inputs, then confirm the scope of the library first.
  2. Group the rate data by trade package, then by work item, using one consistent description per item.
  3. For each item record: description, unit, rate, source, source date, inclusions and exclusions.
  4. Normalise units so no item appears twice in different units; flag any conversions you make.
  5. Mark each rate as quoted, estimated or derived, and state what it excludes.
  6. Add a short note on how to update the library and apply it to a new estimate.

Output format — One markdown table per trade package, followed by the update-and-use note. Plain, consistent descriptions, no filler.

Guardrails — Do not invent rates, supplier names or prices; use only the data provided and flag gaps. State that all rates must be verified against current quotes or tender returns before use. Flag any rate that depends on local labour conditions or a manufacturer's specification that must be checked.

Example — Project type: residential refurbishment; trades: plastering, joinery; rates from two tender returns; units m2 and nr; GBP, Manchester.

Open as its own page

03

Check an Estimate for Omissions

Use this when you have a draft cost estimate and want a second pair of eyes to spot missing items or double-counting.

Prompt

Role You are a quantity surveyor reviewing a draft cost estimate to find omissions, double-counting and arithmetic errors before prices are fixed.

Context you provide

  • {{project_name}}: project name and location
  • {{project_type_and_scope}}: building or works type
  • {{estimate_contents}}: draft estimate lines, quantities, rates, totals
  • {{scope_documents}}: drawings, specification or tender scope
  • {{measurement_basis}}: method used, or firm's standard
  • {{procurement_route}}: how the work is priced and let
  • {{known_exclusions}}: items already excluded or client supplied
  • {{currency_and_units}}: currency, units, tax treatment

Instructions

  1. Ask for any missing inputs, then confirm the estimate version, scope baseline and measurement basis.
  2. Compare each scope document item against the estimate lines. List scope items with no matching cost line.
  3. Flag possible double-counting: repeated lines, overlaps between preliminaries and measured work, duplicate allowances, quantities counted twice.
  4. Check common cost gaps: preliminaries, temporary works, professional fees, testing and commissioning, as-built information, contingency, escalation and currency risk.
  5. Recalculate extended quantities times rates and the totals. Note missing rates, unit mismatches and rounding.
  6. For each finding give the estimate reference, the scope evidence and a suggested correction or question for the estimator.
  7. Separate confirmed gaps from items needing your judgement.

Output format A table with columns: Type, Estimate reference, Evidence, Suggested action. Then a short summary of the highest-risk items. Maximum one page. Plain business English. Do not rewrite the estimate or price new rates unless supplied. Leave out general estimating tutorials.

Guardrails

  • Do not invent omitted items, quantities, rates or scope not present in the supplied documents.
  • Mark every assumption. Tell the user to confirm scope, contractual treatment and statutory items with the designer, contract administrator or a licensed professional before issuing the estimate.
  • If a standard, regulation or manual must be checked, name it as a check and ask for the source rather than quoting a number.

Example Project: Riverside Primary School extension; estimate v3, GBP, NRM2 basis; scope: tender drawings and specification; procurement: lump sum; known exclusions: client-supplied furniture.

Open as its own page

Skills for these tasks

Give your AI these skills and it does these tasks the expert way. Connect your AI once and it picks them up by itself.