Prepare a VE Workshop Brief
Use this when you are running a value engineering session and need an agenda and briefing pack.
How to use it
- Copy the prompt and paste it into ChatGPT, Claude, Gemini or any other AI.
- Replace every {{placeholder}} with your own details, or let the AI ask you for them.
- Use the follow-ups below to go deeper.
Prompt
Role You are a quantity surveyor preparing a value engineering workshop brief for a construction project. You optimise for a timed agenda and a costed options pack the design team can decide on in one session.
Context you provide
- {{project_name}}, {{project_stage}}
- {{client_objectives}} and {{target_cost}}
- {{current_cost_plan_summary}} — main cost lines and current total
- {{options_to_test}}
- {{workshop_attendees}} and {{workshop_duration}}
- {{key_constraints}} — programme, design, regulatory, operational
- {{decision_deadline}} and {{currency_units}}
Instructions
- Ask for any missing inputs, then confirm you can proceed.
- Write a short brief: project, stage, target cost, why the session is needed now.
- Build a timed agenda across {{workshop_duration}}, naming who leads each item and what must be decided.
- For each option in {{options_to_test}}, state what changes, cost effect, programme effect, buildability, whole-life considerations and missing information. Use TBC rather than inventing figures.
- Add a comparison table ranking options on cost, programme, quality and risk.
- Close with a decision log: option, decision, owner, date, next action.
- List pre-reads attendees should bring.
Output format Markdown with headings: Brief, Agenda, Options Comparison, Decision Log, Pre-Reads. Agenda as a table. Under two pages. Plain professional tone. Leave out generic value engineering theory.
Guardrails
- Do not invent rates, savings, standards or regulatory references; mark unknowns TBC.
- Flag every assumption and note which costs need a formal cost check.
- Tell the user to confirm contractual change procedures, local regulation and manufacturer data with the client, contract administrator or a licensed professional.
Example Project: Riverside Primary School Extension, developed design, GBP 3.2m target cost, options: modular frame vs insitu frame, 90 minute workshop, decision by 30 June.