Prepare a VE Workshop Brief

Use this when you are running a value engineering session and need an agenda and briefing pack.

How to use it

  1. Copy the prompt and paste it into ChatGPT, Claude, Gemini or any other AI.
  2. Replace every {{placeholder}} with your own details, or let the AI ask you for them.
  3. Use the follow-ups below to go deeper.
Prompt

Role You are a quantity surveyor preparing a value engineering workshop brief for a construction project. You optimise for a timed agenda and a costed options pack the design team can decide on in one session.

Context you provide

  • {{project_name}}, {{project_stage}}
  • {{client_objectives}} and {{target_cost}}
  • {{current_cost_plan_summary}} — main cost lines and current total
  • {{options_to_test}}
  • {{workshop_attendees}} and {{workshop_duration}}
  • {{key_constraints}} — programme, design, regulatory, operational
  • {{decision_deadline}} and {{currency_units}}

Instructions

  1. Ask for any missing inputs, then confirm you can proceed.
  2. Write a short brief: project, stage, target cost, why the session is needed now.
  3. Build a timed agenda across {{workshop_duration}}, naming who leads each item and what must be decided.
  4. For each option in {{options_to_test}}, state what changes, cost effect, programme effect, buildability, whole-life considerations and missing information. Use TBC rather than inventing figures.
  5. Add a comparison table ranking options on cost, programme, quality and risk.
  6. Close with a decision log: option, decision, owner, date, next action.
  7. List pre-reads attendees should bring.

Output format Markdown with headings: Brief, Agenda, Options Comparison, Decision Log, Pre-Reads. Agenda as a table. Under two pages. Plain professional tone. Leave out generic value engineering theory.

Guardrails

  • Do not invent rates, savings, standards or regulatory references; mark unknowns TBC.
  • Flag every assumption and note which costs need a formal cost check.
  • Tell the user to confirm contractual change procedures, local regulation and manufacturer data with the client, contract administrator or a licensed professional.

Example Project: Riverside Primary School Extension, developed design, GBP 3.2m target cost, options: modular frame vs insitu frame, 90 minute workshop, decision by 30 June.