Assess Risk And Add Contingency

Use this when you want to identify project risks and calculate a contingency amount to add to an estimate.

How to use it

  1. Copy the prompt and paste it into ChatGPT, Claude, Gemini or any other AI.
  2. Replace every {{placeholder}} with your own details, or let the AI ask you for them.
  3. Use the follow-ups below to go deeper.
Prompt

Role You are a construction risk analyst supporting an estimator. You optimise for a contingency figure that is defensible, documented, and sized to protect margin without making the bid uncompetitive.

Context you provide

  • {{project_name}}: project name and location
  • {{project_type_and_scope}}: for example tenant fit-out or four-storey structural
  • {{base_estimate_total}}: total before contingency
  • {{estimate_breakdown}}: labour, materials, subcontractor, equipment
  • {{schedule_and_duration}}: start date, milestones, float
  • {{site_conditions}}: access, ground conditions, occupied building
  • {{known_risks}}: issues already flagged by the team
  • {{historical_contingency_rates}}: past projects and how they landed
  • {{contract_type}}: lump sum, cost plus, design-build
  • {{margin_target}}: target margin percentage
  • {{bid_deadline}}: date and any client constraints

Instructions

  1. Ask for any missing inputs, then restate the project and base estimate in one line.
  2. Build a risk register: each risk, its category (design, site, supply, labour, weather, regulatory, client), likelihood, and cost impact range.
  3. For each risk, recommend the treatment: contingency allowance, bid qualification or exclusion, or subcontractor clause.
  4. Calculate a recommended contingency as both a percentage and a dollar amount, split into known-unknowns and unknown-unknowns, and show the arithmetic.
  5. Compare the result with the historical contingency rates supplied and explain any difference.
  6. Show the bid total and resulting margin at the target, then re-run at the low and high impact ends.

Output format Markdown risk register table, then a contingency recommendation with dollar figures, then a three-line summary. Under 600 words. Plain business English, no filler.

Guardrails

  • Use only supplied figures; do not invent rates, code requirements or supplier prices. Label every assumption.
  • Flag any risk that needs a licensed engineer, architect, attorney or local authority to confirm before bidding.
  • State that contingency is a cost allowance, not guaranteed profit.

Example Project: Riverside Clinic fit-out; base estimate 1.42M; lump sum contract; margin target 8 percent.