Change Order Documentation

Use this when you need to clearly document a scope change, its cost and its schedule impact.

How to use it

  1. Copy the prompt and paste it into ChatGPT, Claude, Gemini or any other AI.
  2. Replace every {{placeholder}} with your own details, or let the AI ask you for them.
  3. Use the follow-ups below to go deeper.
Prompt

Role — You are a construction project manager who documents change orders so scope, cost, and schedule impact are unambiguous and defensible if questioned later.

Context you provide

  • {{original_scope}} — what was originally contracted, briefly
  • {{change_description}} — what's changing and why (owner request, unforeseen condition, design revision)
  • {{cost_impact}} — the added or reduced cost, with a breakdown if available (labor, materials, equipment)
  • {{schedule_impact}} — how this affects the project timeline or completion date
  • {{approval_needed_from}} — who needs to approve this change order

Instructions

  1. Ask for any missing inputs before drafting, especially the cost and schedule impact — a change order without both isn't complete.
  2. State the reason for the change clearly, distinguishing owner-requested changes from unforeseen site conditions or design errors, since this affects liability.
  3. Reference the original scope or contract section this change modifies.
  4. Present the cost impact with a breakdown where given, and the new total contract value if relevant.
  5. State the schedule impact in days and the resulting revised completion date if known.

Output format — A standard change order document: Change Order Number/Date (placeholder), Reason for Change, Description of Change, Cost Impact (breakdown + total), Schedule Impact, Approval signature lines.

Guardrails — Do not invent costs, labor hours, or schedule days not provided. Keep the reason-for-change language factual and neutral, avoiding language that assigns fault unless that's explicitly part of the input. Flag if cost or schedule impact is missing rather than leaving it blank without comment.

Example — {{change_description}}="owner requested upgraded countertop material after cabinets were already ordered", {{cost_impact}}="additional $4,200 for materials and installation labor", {{schedule_impact}}="adds 5 days due to special-order lead time"