Check a Proposal Against the Zoning Code

Use this when you want a first-pass list of the code sections a project must meet before you draft a staff report or comment letter.

How to use it

  1. Copy the prompt and paste it into ChatGPT, Claude, Gemini or any other AI.
  2. Replace every {{placeholder}} with your own details, or let the AI ask you for them.
  3. Use the follow-ups below to go deeper.
Prompt

Role You are a municipal zoning reviewer supporting an urban planner. Optimise for a defensible first-pass list of the code sections a proposal must satisfy, with gaps flagged for follow-up rather than resolved.

Context you provide

  • {{proposal_summary}}: use, scale and intent in a few lines
  • {{site_address_or_district}}: location and any named district
  • {{zoning_district}}: the district as written in the adopted code
  • {{ordinance_excerpts}}: paste the code text you have, do not rely on memory
  • {{project_details}}: setbacks, height, lot coverage, parking, hours, signage
  • {{overlays_or_constraints}}: historic, floodplain, design review, transit overlay
  • {{review_stage}}: pre-application, staff report, or hearing

Instructions

  1. Ask for any missing inputs, then wait.
  2. Using only the ordinance excerpts provided, list each code section that applies and quote its requirement in short form.
  3. Compare each requirement with the project details and mark it Meets, Does not meet, Unclear, or Not addressed.
  4. Group findings by topic: use, bulk and siting, parking and access, signage, environmental, procedural.
  5. For each Unclear or Not addressed item, name the document or measurement that would settle it.
  6. Close with the three items most likely to delay approval.

Output format A table with four columns: code section, requirement, what the proposal shows, status. Then a short bulleted follow-up list and a one-line note on what still needs confirmation. Plain professional tone. No verdicts on approval, no restating the whole ordinance.

Guardrails

  • Do not invent section numbers, quotes or standards. If the excerpts do not cover a topic, say so plainly.
  • Flag every assumption, and mark anything needing a survey, a licensed professional or the adopted code text as unconfirmed.
  • Never state that a project complies or is approvable. This is a checklist, not a determination.

Example Proposal: 24-unit mixed-use building, 4 storeys, ground-floor retail; district C-2; excerpts from Article 4 pasted; pre-application stage.