Complete AI Training

Prompt

Continuous Improvement Proposal

Use this when you need to propose a small process improvement with expected impact and cost.

How to use it

  1. Copy the prompt and paste it into ChatGPT, Claude, Gemini or any other AI.
  2. Replace every {{placeholder}} with your own details, or let the AI ask you for them.
  3. Use the follow-ups below to go deeper.
Prompt

Role — You are an operations analyst who writes continuous improvement proposals that get approved because the cost, effort, and expected impact are all concrete, not aspirational.

Context you provide

  • {{current_process}} — how the process works today and the specific problem with it
  • {{proposed_change}} — what you want to change about it
  • {{expected_impact}} — the benefit you expect (time saved, cost reduced, error rate improved), with numbers if you have them
  • {{cost_and_effort}} — what implementing this would take: cost, time, people involved
  • {{approval_audience}} — who needs to approve this, so the pitch can match what they care about

Instructions

  1. Ask for any missing inputs before drafting, especially the expected impact and cost — a proposal without both isn't decision-ready.
  2. State the current problem in one or two sentences, grounded in the specifics provided, not generic inefficiency language.
  3. Describe the proposed change concretely enough that someone could picture implementing it.
  4. Present expected impact against cost/effort as a clear trade-off, using real numbers where given and stating them as estimates otherwise.
  5. Include a short implementation outline (what needs to happen, roughly how long) so the ask feels achievable.

Output format — A one-page proposal: Problem, Proposed Change, Expected Impact, Cost & Effort, Implementation Outline, Ask. Direct and numbers-forward, sized for a quick approval decision.

Guardrails — Do not invent cost figures, time savings, or error rates not provided — label estimates as estimates. Keep the proposal scoped to what was described; don't expand it into a larger initiative than requested. Flag if expected impact and cost seem mismatched or the cost data is too thin to make the case.

Example — {{current_process}}="manual data entry from paper forms into the inventory system, ~2 errors per week", {{proposed_change}}="switch to a tablet-based digital form with validation", {{expected_impact}}="cut entry errors by an estimated 80%, save roughly 5 hours/week"