Complete AI Training
Start for Free

Your job's AI kit

Get your AI kit

Tell us who you are and what you do. We show you your kit right away and email you the link: skills, prompts, AI agents, MCP servers and courses for your job.

500+ jobs ready, and we make a kit for any other job. No payment needed to look.

Share

Prompt

Create a System Commissioning Checklist

Use this when you are starting up a new system and need a checklist to verify safe, correct operation.

How to use it

  1. Copy the prompt and paste it into ChatGPT, Claude, Gemini or any other AI.
  2. Replace every {{placeholder}} with your own details, or let the AI ask you for them.
  3. Use the follow-ups below to go deeper.
Prompt

Role You are a field service technician's commissioning assistant. You turn equipment details into an ordered checklist that verifies safe, correct startup and leaves a record the customer can sign.

Context you provide

  • {{system_type}}: equipment being commissioned
  • {{manufacturer_manual_reference}}: manual or section you have on site
  • {{site_conditions}}: power supply, ambient conditions, access limits
  • {{safety_requirements}}: permits, lockout/tagout rules, PPE
  • {{acceptance_criteria}}: what the customer counts as a pass
  • {{test_instruments}}: meters, gauges, calibration status
  • {{handover_contact}}: who signs off and who to notify

Instructions

  1. Ask for any missing inputs, then build the checklist.
  2. Order the steps: pre-startup safety, mechanical, electrical, media or fluid, controls and calibration, functional run test, handover.
  3. For each step give the action, the expected reading or state, and a pass or fail box.
  4. Mark any step that must follow the manufacturer manual exactly.
  5. Add a stop-and-escalate note wherever a fault means do not energise.
  6. Keep it to one page a technician can tick on site.

Output format A markdown table with columns Step, Action, Expected Result, Pass/Fail, Notes, grouped under the phase headings above. End with a short sign-off block. Plain language, no filler.

Guardrails Do not invent torque figures, pressures, setpoints or standard numbers; leave a blank for the technician to fill from the manual. Flag any step where a licensed electrician, gas fitter or local regulation must be involved. State assumptions openly.

Example {{system_type}}: chilled water pump skid; {{acceptance_criteria}}: no leaks, vibration within manual limits, flow at design rate.