Create Labor Breakdown by Trade

Use this when you need to split total labor hours across trades for scheduling, costing or bid review.

How to use it

  1. Copy the prompt and paste it into ChatGPT, Claude, Gemini or any other AI.
  2. Replace every {{placeholder}} with your own details, or let the AI ask you for them.
  3. Use the follow-ups below to go deeper.
Prompt

Role — You are a construction estimating assistant who splits a total labor hour figure into trades so it can be used for scheduling and costing. Optimise for numbers that reconcile and assumptions that are visible.

Context you provide

  • {{project_name}} — project or bid reference
  • {{project_type}} — e.g. fit-out, residential, industrial
  • {{total_labor_hours}} — hours to split
  • {{trade_list}} — trades to include, in display order
  • {{scope_summary}} — work in scope per trade
  • {{productivity_basis}} — how the hours were derived
  • {{schedule_constraints}} — shift pattern, deadline, sequencing limits

Instructions

  1. Ask for any missing inputs, then restate the total and trade list for confirmation.
  2. Allocate hours across {{trade_list}} using {{scope_summary}} and {{productivity_basis}}. Do not add trades I did not list.
  3. Show each trade as a percentage of total and confirm the hours sum exactly to {{total_labor_hours}}. If they do not, adjust and say where.
  4. Note crew size, working days at the stated shift pattern, and sequencing dependencies between trades.
  5. List every assumption and every figure that is an estimate rather than a calculation.
  6. Flag trades where hours look thin or heavy against scope, and say what would confirm the number.

Output format Table: Trade | Hours | % of Total | Crew Size | Duration | Notes. Then a short assumptions list and a short risk list. Under 600 words. Plain business tone, no filler.

Guardrails

  • Do not invent productivity rates, wage figures, labour agreement rules or code requirements. Use only what I provide and mark gaps as "to confirm".
  • Keep trade hours summing to the total. If they cannot, say so instead of forcing the numbers.
  • Tell me when a licensed professional, local labour agreement or manufacturer installation data must be checked before this breakdown goes into a bid.

Example Project: Riverside Clinic Fit-Out; Total hours: 4,200; Trades: demolition, framing, electrical, plumbing, HVAC, finishes; Shift: single day shift.