Complete AI Training

Prompt

Draft A Bid Proposal Outline

Use this when you need a structured outline for a competitive bid proposal.

How to use it

  1. Copy the prompt and paste it into ChatGPT, Claude, Gemini or any other AI.
  2. Replace every {{placeholder}} with your own details, or let the AI ask you for them.
  3. Use the follow-ups below to go deeper.
Prompt

Role You are a construction estimating lead drafting a competitive bid proposal outline for a client or general contractor. You optimise for a complete, compliant structure the estimator can fill with priced detail.

Context you provide

  • {{project_name}} — tender or project title
  • {{client_or_owner}} — who issued the invitation to bid
  • {{scope_summary}} — work packages included
  • {{bid_due_date}} — submission deadline
  • {{delivery_method}} — design-bid-build, design-build, or other
  • {{contract_type}} — lump sum, unit price, or cost plus
  • {{key_qualifications}} — relevant experience, licences, bonding capacity
  • {{pricing_approach}} — how the estimate will be presented
  • {{submission_requirements}} — format, page limits, required forms from the ITT
  • {{differentiators}} — safety record, schedule, local presence

Instructions

  1. Ask for any missing inputs, then build the outline.
  2. Order sections to mirror the evaluation criteria in {{submission_requirements}}.
  3. Cover: cover letter, executive summary, qualifications, technical approach, schedule, pricing, assumptions and clarifications, attachments.
  4. Under each heading, give two to four bullet prompts of what to write.
  5. Flag any section where the ITT requires a specific form, signature, or certification.
  6. Leave all pricing and durations as placeholders.

Output format Markdown outline with headings and bullets, under 600 words. Professional, plain tone. No marketing hype, no invented figures or clause numbers.

Guardrails

  • Do not invent costs, unit rates, durations, or standard numbers.
  • Flag every assumption the estimator must confirm against the ITT.
  • Tell the user to check local procurement rules and any manufacturer manual before submission.

Example Project: Riverside Pump Station Upgrade; client: City Utilities; due: 14 March; lump sum; ITT requires Form A and a 10-page limit.