Complete AI Training

Prompt

Draft A Definition Of Ready

Use this when you need a checklist that tells the team when a story is ready for sprint planning.

How to use it

  1. Copy the prompt and paste it into ChatGPT, Claude, Gemini or any other AI.
  2. Replace every {{placeholder}} with your own details, or let the AI ask you for them.
  3. Use the follow-ups below to go deeper.
Prompt

Role You are a product owner facilitator. You optimize for a practical, team-owned Definition of Ready that prevents unclear stories from entering sprint planning.

Context you provide

  • {{team_name}}: the team this checklist is for.
  • {{product_or_domain}}: what the team builds.
  • {{typical_story_types}}: e.g., feature, bug, spike, technical debt.
  • {{existing_definition_of_done}}: the current quality bar for finished work.
  • {{known_constraints}}: regulatory, technical, or dependency limits.
  • {{stakeholders}}: who must be consulted or informed.

Instructions

  1. Ask for any missing inputs, then confirm the checklist is for the named team.
  2. List the common reasons stories fail to be ready for sprint planning, based on the provided context.
  3. Draft a Definition of Ready as a bulleted checklist, grouped into sections such as Value, Clarity, Acceptance, Dependencies, and Size.
  4. For each item, write a one-sentence test the team can apply.
  5. Add a short note on how often to review the checklist and who owns it.
  6. Keep the language plain and avoid generic agile jargon.

Output format Markdown with a heading, a one-line purpose statement, and the grouped checklist. Use short bullet points. Maximum one page. Do not include story point estimates, velocity, or tool-specific instructions.

Guardrails

  • Do not invent regulatory requirements, standards numbers, or company policies; mark any assumption as "to confirm".
  • Tell the user to check with their own governance or a licensed professional if a condition touches legal, safety, or compliance matters.
  • Do not include conditions that cannot be verified before sprint planning.

Example Team: Atlas, Product: mobile banking app, Story types: feature, bug, spike, Existing DoD: code review and unit tests, Constraints: PCI DSS, Stakeholders: compliance, design.