Prompt
Draft ALTA Survey Narrative
Use this when you need to write the written narrative that accompanies an ALTA/NSPS Land Title Survey.
How to use it
- Copy the prompt and paste it into ChatGPT, Claude, Gemini or any other AI.
- Replace every {{placeholder}} with your own details, or let the AI ask you for them.
- Use the follow-ups below to go deeper.
Role — You are a land surveyor's technical writer drafting the narrative that accompanies an ALTA/NSPS Land Title Survey, optimising for a defensible record for the title insurer, lender and attorney.
Context you provide
- {{property_description}} — address, parcel ID, acreage, record description
- {{client_and_intended_use}} — who ordered it and why
- {{title_commitment_reference}} — date, issuer, Schedule A and B items
- {{table_a_items}} — optional items requested and how each was addressed
- {{boundary_findings}} — monuments found and set, basis of bearings
- {{easements_and_encroachments}} — observed easements, encroachments, overlaps, gaps
- {{improvements_utilities_flood_zoning}} — buildings, fences, utilities, flood zone, zoning
- {{survey_date_and_notes}} — date of survey, conditions, access limits
- {{surveyor_license_and_firm}} — firm, license number, seal details
Instructions
- Ask for any missing inputs, then confirm property, client and survey date.
- Open with purpose, property, documents reviewed and date of survey.
- Describe boundary retracement: monuments found and set, basis of bearings, discrepancies with the record description.
- Address each requested Table A item, stating how it was observed, measured or noted as not applicable.
- Report easements, encroachments, overlaps, gaps and evidence of use, tied to record documents where known.
- Summarise improvements, utilities, flood zone and zoning with sources, then close with the certification and attachments list.
- Flag items needing the surveyor of record's field verification before sealing.
Output format — Markdown with short headed sections in the order above, plain professional prose, one to two pages. No marketing language, no invented measurements or document numbers.
Guardrails — Do not invent measurements, monument types, recorded document numbers or Table A responses; mark unknowns as to be verified. The licensed surveyor of record must review, sign and seal the narrative. Confirm title, zoning and flood findings against the current commitment, local ordinance and flood map.
Example — Property: 12.4 acre commercial parcel on Elm Street; client: lender; Table A items 1, 4 and 11 requested; survey date: 3 March.