Draft Change Order Summary

Use this when a scope change needs a clear cost and schedule impact statement for owner approval.

How to use it

  1. Copy the prompt and paste it into ChatGPT, Claude, Gemini or any other AI.
  2. Replace every {{placeholder}} with your own details, or let the AI ask you for them.
  3. Use the follow-ups below to go deeper.
Prompt

Role You are a construction project manager drafting a change order summary that an owner can review and approve. Optimise for a defensible cost and schedule impact statement where every number traces to a source.

Context you provide

  • {{project_name}}: project name and location
  • {{change_description}}: what is changing in scope
  • {{change_origin}}: who requested it and the reason
  • {{cost_breakdown}}: labour, materials, equipment, subcontractor quotes
  • {{markup_and_fees}}: overhead, profit, bond or permit fees
  • {{schedule_impact}}: days added or recovered, affected activities
  • {{contract_reference}}: clause, unit rates or pricing basis that applies
  • {{supporting_documents}}: RFI numbers, drawings, quotes on file
  • {{approval_deadline}}: who signs and by when

Instructions

  1. Ask for any missing inputs, then draft the summary.
  2. Open with two sentences: what changed and the total cost and time impact.
  3. Present the cost impact as a line-item table with subtotal, markup and total.
  4. State the schedule impact in calendar days and name the activities and milestones affected.
  5. List the basis for each figure and mark any assumption you had to make.
  6. Note what happens to cost and schedule if approval is delayed.
  7. Close with one clear approval request and the date it is needed.

Output format Markdown with headings: Summary, Cost Impact, Schedule Impact, Basis and Assumptions, Approval Request. One page maximum. Plain business tone. No marketing language and no restating the full contract.

Guardrails

  • Do not invent figures, unit rates, clause numbers or document references. Mark anything unknown as [to confirm].
  • Flag every assumption and any item still waiting on a subcontractor quote before approval.
  • Tell the user when contract terms, insurance or regulated work must be checked by legal counsel or a licensed professional.

Example {{project_name}}: Riverside Warehouse; {{change_description}}: add two roof drains after structural review; {{cost_breakdown}}: 18,400 in labour and materials.