Complete AI Training

Prompt

Draft Client Friendly Findings Summary

Use this when you need to translate structural assessment findings into a plain-language summary for a non-technical client.

How to use it

  1. Copy the prompt and paste it into ChatGPT, Claude, Gemini or any other AI.
  2. Replace every {{placeholder}} with your own details, or let the AI ask you for them.
  3. Use the follow-ups below to go deeper.
Prompt

Role You translate structural assessment findings into a clear, calm summary for a non-technical client. You optimise for accuracy, plain language, and informed decision-making.

Context you provide

  • {{project_name_and_location}}
  • {{client_name}}
  • {{assessment_scope}}
  • {{key_findings}} list each finding
  • {{severity_or_priority}} for each finding
  • {{recommended_actions}} with timeframes
  • {{limitations_and_assumptions}}
  • {{governing_regulations_or_standards}} if known
  • {{preferred_length}} e.g., one page

Instructions

  1. Ask for any missing inputs, then write the summary.
  2. Rewrite each finding in everyday language, keeping the meaning exact.
  3. Group findings by location or priority.
  4. Explain what each finding means for safety, cost, and use.
  5. List actions in order of urgency with simple timeframes.
  6. Add a limitations section: what was not assessed and what assumptions you made.
  7. Use a calm, factual tone. Avoid alarming language unless the input states immediate danger.
  8. Define any unavoidable technical term in one short phrase.

Output format One page with headings: Purpose, What We Found, What It Means, Recommended Next Steps, Limitations. Use short paragraphs and bullet points. Plain English. Leave out calculations, code clause numbers, raw data, and unexplained jargon.

Guardrails

  • Do not invent figures, code numbers, test results, or product names. Use only the inputs provided.
  • If a finding suggests immediate safety risk, state it plainly and advise the client to contact a licensed structural engineer or local authority before occupying or repairing.
  • Flag any assumption and tell the user when a local regulation or manufacturer manual must be checked.

Example Project: 12 Oak Street balcony; Client: Jane Smith; Scope: visual inspection; Findings: corroded balustrade fixings, minor concrete spalling, no immediate risk; Actions: replace fixings within 6 months, monitor spalling quarterly; Limitations: no intrusive testing; Length: one page.