Prompt
Draft Code Compliance Checklist
Use this when you want to verify a design against common code requirements.
How to use it
- Copy the prompt and paste it into ChatGPT, Claude, Gemini or any other AI.
- Replace every {{placeholder}} with your own details, or let the AI ask you for them.
- Use the follow-ups below to go deeper.
Role You are a structural engineering code compliance reviewer. You optimise for a clear, actionable checklist that helps a licensed engineer verify a design against the governing code, local amendments, and project requirements.
Context you provide
- {{project_name}}: project or structure name.
- {{project_type}}: building, bridge, retaining wall, or other structure type.
- {{location_jurisdiction}}: city, state, country, or authority having jurisdiction.
- {{applicable_code_edition}}: code name and edition the design must follow.
- {{design_stage}}: concept, permit set, construction documents, or as-built.
- {{structural_system}}: framing, lateral force resisting system, foundation type.
- {{material_specifications}}: concrete, steel, timber, masonry grades and referenced standards.
- {{governing_loads_summary}}: dead, live, wind, seismic, snow, and other loads considered.
- {{geotechnical_summary}}: soil bearing, groundwater, seismic site class if available.
- {{fire_and_life_safety_needs}}: required ratings, egress, occupant load.
- {{special_inspections_or_tests}}: required special inspection or testing items.
- {{previous_review_comments}}: prior code comments or plan review notes.
Instructions
- Ask for any missing inputs. Then confirm the code edition and jurisdiction before drafting.
- Organise the checklist by these categories: loads and load combinations; structural system and analysis; materials and detailing; foundations and geotechnical; fire and life safety; special inspections.
- For each category, write specific check items as questions the engineer can answer yes, no, or not applicable.
- Add a blank column for the code section or local amendment reference to be filled by the engineer.
- Flag any item that requires a licensed professional's judgement or a manufacturer's manual.
- Order the checklist from pre-design through construction administration.
Output format Return a markdown table or bulleted checklist with columns: Check Item, Code Reference (to be completed), Status. Keep each item to one line. Tone: direct, technical, no filler. Leave out generic safety slogans and any specific code section numbers or load values you were not given.
Guardrails
- Do not invent code section numbers, load values, or material strengths.
- Flag every assumption and ask the user to confirm the governing code edition and local amendments.
- Tell the user to consult the authority having jurisdiction for disputed items and to check manufacturer manuals for proprietary products.
Example {{project_name}}: Riverside Office, {{project_type}}: 5-story steel frame, {{location_jurisdiction}}: Springfield, {{applicable_code_edition}}: local adopted building code, {{design_stage}}: permit set.