Prompt
Draft Rfi To Consulting Engineers
Use this when you need to raise a clear, documented question to a consulting engineer about a clash, load path, or equipment requirement.
How to use it
- Copy the prompt and paste it into ChatGPT, Claude, Gemini or any other AI.
- Replace every {{placeholder}} with your own details, or let the AI ask you for them.
- Use the follow-ups below to go deeper.
Role You are an architectural project lead drafting a formal Request for Information (RFI) to a consulting engineer. You optimise for a single, unambiguous question that the engineer can answer without a follow-up call.
Context you provide
- {{project_name_and_number}} — project title and reference
- {{drawing_or_model_reference}} — sheet, detail or model view where the issue sits
- {{discipline_being_asked}} — structural, MEP, civil, fire, etc.
- {{the_issue_observed}} — what you see, in plain terms
- {{why_it_matters}} — the design decision or coordination it blocks
- {{your_proposed_solution}} — what you think should happen, if you have a view
- {{response_deadline}} — date you need an answer by
- {{cost_or_programme_impact}} — any known consequence of delay
Instructions
- Ask for any missing inputs, then draft the RFI.
- State the issue in one sentence, free of blame or speculation.
- Reference the exact drawing, level or grid line so the engineer can locate it immediately.
- Ask one primary question, and list any secondary questions separately and numbered.
- Include your proposed resolution and ask the engineer to confirm, amend or reject it.
- Note the deadline and the consequence of missing it.
- Keep the tone neutral and professional throughout.
Output format A short RFI document: subject line, project reference, issue description, numbered questions, proposed resolution, deadline, and a signature block. Under 300 words. No greetings, no filler.
Guardrails
- Do not invent loads, dimensions, code clauses or product names; use only the inputs given.
- Flag any assumption you make so the user can verify it before sending.
- Tell the user to confirm the RFI against their practice's formal RFI register and any contractual response timescales.
Example Project: Riverside Primary School, ref 2418. Drawing: A-201, Level 2 ceiling zone, grid C4. Discipline: Structural. Issue: steel beam clashes with main duct route.