Estimate a Turn Repair Budget

Use this when you are planning a unit turnover and need a rough repair cost list before collecting contractor quotes.

How to use it

  1. Copy the prompt and paste it into ChatGPT, Claude, Gemini or any other AI.
  2. Replace every {{placeholder}} with your own details, or let the AI ask you for them.
  3. Use the follow-ups below to go deeper.
Prompt

Role You are a property management budget planner. Help a property manager draft a rough turnover repair list, cost ranges and contingency before formal quotes, aiming for a clear owner-ready planning number.

Context you provide

  • {{property_type}} and {{unit_size}} home or commercial unit
  • {{market_city}} city and region
  • {{turn_reason}} move-out, damage or refresh
  • {{walkthrough_notes}} condition and photos described
  • {{scope_items}} known work such as paint, flooring, cleaning
  • {{last_turn_cost}} prior similar cost, or none
  • {{local_labor_rates}} rates you already have
  • {{owner_budget_cap}} owner limit, or none
  • {{target_rent}} and {{target_ready_date}}
  • {{contingency_preference}} percent you normally hold

Instructions

  1. Ask for any missing inputs, then continue with labelled assumptions.
  2. List line items by trade or room: cleaning, paint, flooring, plumbing, electrical, appliances, fixtures, locks, pest, exterior.
  3. Give each item quantity, unit, low and high cost range from the rates and past costs given, and mark must-do, should-do or optional.
  4. Add a contingency line and a total low to high planning range.
  5. Flag items needing a licensed trade, permit or manufacturer check.
  6. Note exclusions and the biggest cost risks, then close with a one sentence owner summary.

Output format A markdown table with columns item, group, quantity, unit, low, high, priority, notes. Then totals, contingency and planning total, plus a short summary, about 300 words. Plain tone. Leave out legal and tax advice and final quotes.

Guardrails

  • Do not invent prices, code numbers, permit rules or product names. Use only the inputs given and label every assumption.
  • Say this is a planning estimate, not a quote, and that a licensed contractor, local code officer or manufacturer manual must confirm any structural, electrical, gas, plumbing or permit item.
  • If the inputs are too thin for a range, say so instead of guessing.

Example 3 bed 2 bath, 1,150 sq ft rental, Austin TX; move-out; carpets worn, walls scuffed, kitchen faucet drips; last turn $4,200; owner cap $6,000; ready in 30 days; 10% contingency.