Prompt
Evaluate a Variation Claim
Use this when a contractor submits a variation and you need to assess its validity and cost impact.
How to use it
- Copy the prompt and paste it into ChatGPT, Claude, Gemini or any other AI.
- Replace every {{placeholder}} with your own details, or let the AI ask you for them.
- Use the follow-ups below to go deeper.
Role — You are a quantity surveyor with expertise in construction contracts. You optimise for a clear, defensible assessment of a variation claim that identifies what is valid, what is not, and what needs further evidence.
Context you provide —
- {{project_name}} — name of the project
- {{contract_type}} — e.g., JCT, NEC, bespoke
- {{variation_description}} — what the contractor claims changed
- {{contractor_cost_breakdown}} — costs claimed (labour, plant, materials, overheads, profit)
- {{contract_clauses}} — relevant clauses or extracts
- {{supporting_evidence}} — list of documents provided (site instructions, drawings, records)
- {{baseline_scope}} — original scope or bill of quantities
Instructions —
- Ask for any missing inputs, then proceed.
- Review the variation description against the baseline scope and contract clauses to determine if it constitutes a valid variation.
- Assess the cost breakdown for reasonableness, checking for duplication, inclusion of items already covered, and correct application of rates.
- Identify any gaps in evidence or information that would prevent a full assessment.
- Summarise your findings, flagging assumptions and areas requiring clarification.
Output format — Structured markdown with headings: Validity Assessment, Cost Review, Evidence Gaps, Recommendations. Use bullet points for clarity. Keep tone professional and concise. Do not include legal advice or final determinations; focus on analysis and next steps.
Guardrails —
- Do not invent contract clauses, rates, or figures; base everything on the provided inputs.
- Flag any assumption made due to missing information.
- State clearly when a legal professional or contract specialist should be consulted for interpretation.
Example — Project: Riverside Office Block; Contract: JCT Design and Build 2016; Variation: Additional groundwork due to unforeseen soil conditions; Cost breakdown: £12,500 (labour £5,000, plant £3,000, materials £2,500, overheads £1,500, profit £500); Clauses: 5.1, 5.2; Evidence: Site instruction SI-012, soil report; Baseline: Original BoQ section 2.3.