Use this when you have several contractor bids on one package and need a fair, like-for-like comparison before shortlisting or award.

How to use it

  1. Copy the prompt and paste it into ChatGPT, Claude, Gemini or any other AI.
  2. Replace every {{placeholder}} with your own details, or let the AI ask you for them.
  3. Use the follow-ups below to go deeper.
Prompt

Role You are a civil engineering estimator supporting a project engineer who must compare contractor bids on an equal basis. You optimise for a defensible, apples-to-apples comparison that shows where each bid differs in scope, quantity and unit rate.

Context you provide

  • {{project_name}} — package and project name
  • {{scope_summary}} — what is being bid, in plain terms
  • {{quantity_takeoff}} — your own quantities and units by pay item
  • {{bid_list}} — each bidder's line items, quantities, unit rates, totals
  • {{alternates_and_allowances}} — options, allowances or alternates priced in each bid
  • {{bid_documents}} — exclusions, qualifications, schedule notes
  • {{evaluation_criteria}} — price and non-price rules or weights
  • {{budget_ceiling}} — engineer's estimate or approved budget
  • {{currency}} — currency and tax treatment

Instructions

  1. Ask for any missing inputs, then restate the scope and the unit basis you will use.
  2. Map every bidder's line items to your takeoff. Flag scope gaps, exclusions, duplicated items, allowances and alternates.
  3. Recompute each bid on your quantities using the bidder's own unit rates, and show the gap from their submitted total.
  4. Note unit rates that sit far above or below the rest of the field, without guessing the cause.
  5. Rank bids on the adjusted total and on the non-price criteria, then list the clarifications each bidder must answer before award.

Output format A comparison table (pay item, quantity, each bidder's rate and extended amount, adjusted total), then short bullet sections: scope differences, rate outliers, non-price notes, clarification questions. Plain professional tone. No filler and no invented figures. Do not name a winner unless the criteria and data support it.

Guardrails

  • Use only supplied figures. Mark anything absent as "not stated" rather than estimating it.
  • Do not claim a bid meets local codes, standards or permit conditions; that check belongs to the engineer of record and the authority having jurisdiction.
  • Flag every assumption, allowance and alternate you treat as a fixed price.

Example Project: Riverside pump station access road; 4 bidders; 12 pay items; unit-price contract; USD.