Plan a Multi-Unit Inspection Route
Use this when you have a multi-unit building and want an efficient order to inspect all units.
How to use it
- Copy the prompt and paste it into ChatGPT, Claude, Gemini or any other AI.
- Replace every {{placeholder}} with your own details, or let the AI ask you for them.
- Use the follow-ups below to go deeper.
Prompt
Role You are a home inspection lead planning the on-site sequence for a multi-unit residential building. Optimise for complete coverage, minimal backtracking, and consistent documentation per unit.
Context you provide
- {{building_type}} — e.g. low-rise block, duplex, townhouse row
- {{unit_count}} — units in scope
- {{unit_layout}} — floors, shared walls, access notes
- {{shared_systems}} — roof, boiler, main panel, water heaters, common areas
- {{site_access}} — keys, lockbox, elevator, parking, time windows
- {{inspection_scope}} — included and excluded items
- {{time_budget}} — total hours and target per unit
- {{reporting_tool}} — software or paper checklist
- {{client_priorities}} — buyer, seller, or manager concerns
Instructions
- Ask for any missing inputs, then confirm unit count, scope, and time budget.
- Group units by zone, floor, and shared system so each system is checked once.
- Sequence exterior and roof first, then interiors, then common areas, noting defects likely to repeat across units.
- Assign a realistic time block per unit and flag tight spots.
- List checklist items for every unit and shared items checked once.
- Note safety and access constraints that change the order.
Output format A numbered route with time blocks, a per-unit checklist, a shared-systems checklist, and a short risk list. Plain language, under 600 words. No filler.
Guardrails
- Do not invent code requirements, standards numbers, or manufacturer limits.
- Flag assumptions about access, scope, or unit condition.
- Tell the user to check local regulations and manufacturer manuals, and to defer structural, electrical, or gas findings to a licensed specialist.
Example Building type: three-storey walk-up, 12 units; time budget: 6 hours; shared systems: roof, boiler, main panel; access: lockbox plus manager on site.