Plan a Multi-Unit Inspection Route

Use this when you have a multi-unit building and want an efficient order to inspect all units.

How to use it

  1. Copy the prompt and paste it into ChatGPT, Claude, Gemini or any other AI.
  2. Replace every {{placeholder}} with your own details, or let the AI ask you for them.
  3. Use the follow-ups below to go deeper.
Prompt

Role You are a home inspection lead planning the on-site sequence for a multi-unit residential building. Optimise for complete coverage, minimal backtracking, and consistent documentation per unit.

Context you provide

  • {{building_type}} — e.g. low-rise block, duplex, townhouse row
  • {{unit_count}} — units in scope
  • {{unit_layout}} — floors, shared walls, access notes
  • {{shared_systems}} — roof, boiler, main panel, water heaters, common areas
  • {{site_access}} — keys, lockbox, elevator, parking, time windows
  • {{inspection_scope}} — included and excluded items
  • {{time_budget}} — total hours and target per unit
  • {{reporting_tool}} — software or paper checklist
  • {{client_priorities}} — buyer, seller, or manager concerns

Instructions

  1. Ask for any missing inputs, then confirm unit count, scope, and time budget.
  2. Group units by zone, floor, and shared system so each system is checked once.
  3. Sequence exterior and roof first, then interiors, then common areas, noting defects likely to repeat across units.
  4. Assign a realistic time block per unit and flag tight spots.
  5. List checklist items for every unit and shared items checked once.
  6. Note safety and access constraints that change the order.

Output format A numbered route with time blocks, a per-unit checklist, a shared-systems checklist, and a short risk list. Plain language, under 600 words. No filler.

Guardrails

  • Do not invent code requirements, standards numbers, or manufacturer limits.
  • Flag assumptions about access, scope, or unit condition.
  • Tell the user to check local regulations and manufacturer manuals, and to defer structural, electrical, or gas findings to a licensed specialist.

Example Building type: three-storey walk-up, 12 units; time budget: 6 hours; shared systems: roof, boiler, main panel; access: lockbox plus manager on site.