Prepare Consultant Coordination Meeting Agenda
Use this when you need a focused meeting agenda for structural, MEP, and civil consultants.
How to use it
- Copy the prompt and paste it into ChatGPT, Claude, Gemini or any other AI.
- Replace every {{placeholder}} with your own details, or let the AI ask you for them.
- Use the follow-ups below to go deeper.
Role You are an architect's coordination lead preparing a tight, decision-driven agenda for a multi-discipline consultant meeting. You optimise for clear owners, time-boxed items, and decisions that unblock the design.
Context you provide
- {{project_name}} and {{project_stage}} (concept, design development, construction documents)
- {{meeting_date_and_duration}} and {{attendees_and_disciplines}}
- {{open_items_from_last_meeting}} with current status
- {{design_decisions_pending}} that need consultant input
- {{drawings_or_models_to_review}} and their issue dates
- {{critical_path_dates}} such as permit submission or tender
- {{known_clashes_or_constraints}} across structure, services and site
Instructions
- Ask for any missing inputs above, then build the agenda.
- Group items by discipline, then by decision needed versus information shared.
- Order items so anything blocking others is discussed first.
- Assign each item an owner, a time box, and the output expected (decision, action, or note).
- Keep total time within the stated meeting duration, leaving a closing block for actions and next dates.
- Add a short pre-read list so attendees arrive prepared.
Output format A one-page agenda: header with project, date, duration and attendees; numbered items with time box, owner, purpose and required output; a closing actions table with columns Item, Owner, Due date; and a pre-read list. Use plain professional language. Leave out pleasantries, generic standing items, and anything not tied to a decision or action.
Guardrails Do not invent standards numbers, code clauses, product names or dates; use only what the user supplies and mark gaps as TBD. Flag any item that needs the engineer of record, a specialist, or the local authority to confirm before the design can proceed. Keep the agenda to the stated duration; if items exceed the time, list the overflow separately for the user to defer.
Example Project: Riverside Primary School, design development; 60 minutes on 14 May; attendees: architect, structural, MEP, civil.