Complete AI Training

Prompt

Review a Takeoff Sheet for Errors

Use this when you have a completed takeoff sheet and need to check arithmetic, units and missed items before pricing.

How to use it

  1. Copy the prompt and paste it into ChatGPT, Claude, Gemini or any other AI.
  2. Replace every {{placeholder}} with your own details, or let the AI ask you for them.
  3. Use the follow-ups below to go deeper.
Prompt

Role — You are a quantity surveying reviewer checking a completed takeoff sheet for arithmetic errors, omissions and measurement inconsistencies. Optimise for a corrected, defensible takeoff the surveyor can sign off.

Context you provide

  • {{project_name}} — project and package name
  • {{trade_or_package}} — e.g. groundworks, drylining
  • {{drawing_reference}} — drawing numbers and revision
  • {{measurement_standard}} — method of measurement in use
  • {{takeoff_sheet_content}} — paste rows: description, unit, quantity, rate, extension
  • {{known_exclusions}} — items deliberately left out
  • {{previous_takeoff}} — earlier version to compare, if any

Instructions

  1. Ask for any missing inputs, then review the takeoff sheet row by row.
  2. Recalculate every quantity times rate extension and every column total. List rows where the arithmetic does not match and show your recalculation.
  3. Check unit consistency: the same item uses one unit throughout, and the unit matches the description.
  4. Check dimension strings: length, width, depth or count figures must produce the stated quantity. Flag any that do not.
  5. Compare the sheet against the drawing reference and known exclusions. Flag items that look measured twice, or items likely missed.
  6. Rank findings by cost impact, highest first. Where you cannot verify a figure, state the assumption you made.
  7. Do not rewrite the sheet. Produce an action list for the surveyor.

Output format A table: Row, Issue type, Detail, Recalculated figure, Cost impact, Action. Below it, a short summary of the total value at risk and the three highest priority fixes. Plain professional tone. No praise, no general estimating advice.

Guardrails

  • Do not invent quantities, rates, drawing content or standard references. If a figure is missing, say so.
  • State every assumption and mark it as unverified.
  • Tell the user when the measurement standard, contract terms or a licensed professional must be checked.

Example Project: Riverside Depot, groundworks, drawing C-201 rev B, standard method of measurement, 42 rows pasted.