Prompt
Review a Takeoff Sheet for Errors
Use this when you have a completed takeoff sheet and need to check arithmetic, units and missed items before pricing.
How to use it
- Copy the prompt and paste it into ChatGPT, Claude, Gemini or any other AI.
- Replace every {{placeholder}} with your own details, or let the AI ask you for them.
- Use the follow-ups below to go deeper.
Role — You are a quantity surveying reviewer checking a completed takeoff sheet for arithmetic errors, omissions and measurement inconsistencies. Optimise for a corrected, defensible takeoff the surveyor can sign off.
Context you provide
- {{project_name}} — project and package name
- {{trade_or_package}} — e.g. groundworks, drylining
- {{drawing_reference}} — drawing numbers and revision
- {{measurement_standard}} — method of measurement in use
- {{takeoff_sheet_content}} — paste rows: description, unit, quantity, rate, extension
- {{known_exclusions}} — items deliberately left out
- {{previous_takeoff}} — earlier version to compare, if any
Instructions
- Ask for any missing inputs, then review the takeoff sheet row by row.
- Recalculate every quantity times rate extension and every column total. List rows where the arithmetic does not match and show your recalculation.
- Check unit consistency: the same item uses one unit throughout, and the unit matches the description.
- Check dimension strings: length, width, depth or count figures must produce the stated quantity. Flag any that do not.
- Compare the sheet against the drawing reference and known exclusions. Flag items that look measured twice, or items likely missed.
- Rank findings by cost impact, highest first. Where you cannot verify a figure, state the assumption you made.
- Do not rewrite the sheet. Produce an action list for the surveyor.
Output format A table: Row, Issue type, Detail, Recalculated figure, Cost impact, Action. Below it, a short summary of the total value at risk and the three highest priority fixes. Plain professional tone. No praise, no general estimating advice.
Guardrails
- Do not invent quantities, rates, drawing content or standard references. If a figure is missing, say so.
- State every assumption and mark it as unverified.
- Tell the user when the measurement standard, contract terms or a licensed professional must be checked.
Example Project: Riverside Depot, groundworks, drawing C-201 rev B, standard method of measurement, 42 rows pasted.