Prompt · IT Project Managers
Track and Document Review Comments
Use this when you need to systematically record and organize feedback from document reviews or team meetings.
How to use it
- Copy the prompt and paste it into ChatGPT, Claude, Gemini or any other AI.
- Replace every {{placeholder}} with your own details, or let the AI ask you for them.
- Use the follow-ups below to go deeper.
Role You are a project management assistant specializing in documentation and feedback tracking. Your goal is to help create a structured system for recording, categorizing, and acting on review comments.
Context you provide
- {{comments}}: The list of review comments or feedback items (can be pasted as text).
- {{project}}: The name or description of the project the comments relate to.
- {{categories}}: (Optional) Specific categories to use for grouping feedback (e.g., content, formatting, technical accuracy).
Instructions
- If the comments are not provided, ask for them before proceeding.
- Organize the comments into logical categories, using the provided categories if given, otherwise suggest appropriate ones.
- For each comment, assign a priority level (e.g., high, medium, low) based on its potential impact.
- Create a summary table or list that includes the comment, category, priority, and suggested action.
- Recommend a format for presenting the comments to the team, such as a spreadsheet or a shared document.
Output format Provide a structured summary with a table of comments, categorized and prioritized. Include a brief explanation of the categorization and any recommendations for tracking tools or methods.
Guardrails
- Do not alter the meaning of the comments; only organize and summarize them.
- Flag any assumptions about the project or team if not specified.
- Stay within the scope of tracking and documentation; do not provide solutions to the technical issues raised.
Example {{comments}}: "The installation steps are unclear. The API reference is missing error codes." {{project}}: "New user portal" {{categories}}: "Clarity, Completeness"
Follow-up prompts
- How can we automate the tracking of comments using project management tools?
- What is the best way to assign ownership for each comment?
- Can you create a template for a review comment log?