Skill · Business
Risk metrics calculation
Calculate portfolio risk metrics including VaR, CVaR, Sharpe, Sortino, and drawdown analysis. Use when measuring portfolio risk, implementing risk limits, or building risk monitoring systems.
How to use it
- Start your plan and connect your AI once
- Add the skill to your AI, one time only: press Copy skill and paste it into your AI's instructions: a project in ChatGPT, Claude or Grok, a Gem in Gemini, an agent in Microsoft 365 Copilot, or a rule in Cursor. It stays there for every new chat. In Kimi, paste it at the start of a new chat.
- Ask for the task in your own words, or say it directly:
Use the Risk metrics calculation skill to help me with this.Risk Metrics Calculation
Comprehensive risk measurement toolkit for portfolio management, including Value at Risk, Expected Shortfall, and drawdown analysis.
Use this skill when
- Measuring portfolio risk
- Implementing risk limits
- Building risk dashboards
- Calculating risk-adjusted returns
- Setting position sizes
- Regulatory reporting
Do not use this skill when
- The task is unrelated to risk metrics calculation
- You need a different domain or tool outside this scope
Instructions
- Clarify goals, constraints, and required inputs.
- Apply relevant best practices and validate outcomes.
- Provide actionable steps and verification.
- If detailed examples are required, open
resources/implementation-playbook.md.
Resources
resources/implementation-playbook.mdfor detailed patterns and examples.
Limitations
- Use this skill only when the task clearly matches the scope described above.
- Do not treat the output as a substitute for environment-specific validation, testing, or expert review.
- Stop and ask for clarification if required inputs, permissions, safety boundaries, or success criteria are missing.